1.13
SECURING THE HEADERS
1.13.1
Header “A” Installation
1.
Lift and place one “A” 4x4 header into the U-channels between post #1 and post #2.
2.
Locate the two 5/16” holes on each vertical face of the U-channels holding the 4x4 header. Drill 3/32” X 1-1/4”
deep pilot holes at the center of four 5/16” Holes. Locate pilot holes at the center of each 5/16” hole. Repeat for
the opposite end of the header.