
22 |
P a g e
1.11
CREATING THE POST ASSEMBLIES
1.11.1
Adding #4FA Floor Anchor Bracket
1.
Lay a post on the ground.
2.
Lift one end of the post up and slide a #4FA floor anchor bracket, all the way over the post end.
3.
Wrap a piece of electrical tape around the drill bit, spaced 1-1/4” from the drill bit tip. This will act as a hole depth indicator
when you drill each pilot hole. Pilot holes should be drilled at least 1-1/4” deep. A little bit deeper is acceptable but do not
drill less than the required 1-1/4” depth.