Set-up Instructions for RIO Adventure Compact Expandable Table
STEP 1:
Be sure you have
one (1) frame and two (2)
table tops, as shown.
STEP 4:
Extend the telescoping table leg.
Use nut to loosen and tighten. Adjust to
ground slope after table is set up.
Please
note there is one (1) adjustable
telescoping leg.
STEP 3:
Press the buttons to
extend the other three (3)
telescopic table legs. Legs will
snap once in fully-extended
position.
STEP 2:
Unfold legs
so feet point down
toward the floor.
STEP 5:
Splay the frame open.
STEP 6:
Lock all four (4) corner braces.
STEP 7:
Open the
LARGER of the two
table tops.
STEP 8:
Begin unrolling
the table top slats at one
end of the frame until it
completely flat.
STEP 9:
Fold the end
slats over each end and
secure by sliding the
nubs through the holes.
To use the 27.5” x 28.5” table top only
RA-i456 Rev 12/2010
www.IntegrityOutdoorBrands.com
STEP 10:
Attach the two
hook-n-loop tabs on the
undersides of the table.
To attach a handled trash bag:
Locate the hook-n-loop straps on one side of the table top. Be sure they are centered
in between the nubs (they slide easily into place). Thread each hook-n-loop strap
through each of the bag handles (shown in Figure 1) and reattach the straps on the
underside of the table top (shown in Figure 2).
Figure 1
Figure 2
See other side for instructions on how to create a 48” x 27.5” table.