Rinnai IB35R Operating And Installation Instructions Download Page 7

Comple

TESTING & COMMISSIONING

TESTING PROCEDURE

Turn gas supply on and plug the unit into the power supply. (Caution 240V.)

TO CHECK BURNER PRESSURE

   Refer to Data Plate.

   The test point is located on the gas control valve which is

     attached to the control buttons, behind the lower front panel.

   Remove test point screw and attach manometer to test point.

    The test point is on the front side of the gas valve.
    Light heater, push control buttons to the high position and
    check pressure.

   If adjustments are necessary, the regulator is situated on

    the front of the gas control.

   

After checking pressure, turn the unit off, remove manometer and replace test point screw.

•    

Turn the heater on and off a few times to check ignition.

•    

When you are satisfied that the heater is working correctly, reassemble panels.

•    

All burner aeration is factory preset and cannot be adjusted.

•    

If you are unable to get the unit to operate correctly, refer to Troubleshooting on Page 4,

     before contacting your local service agent as listed on Page 11.

•    

It may take approximately 2 hours for the logs to achieve their full flame pattern and glow.

    

During the initial burning in period, some smoke and smell may be experienced. The

     heater should be run on the high position in a well ventilated room until these dissipate.

INSTRUCT CUSTOMER ON USE OF UNIT

Explain to customer about use and care of unit.  Make sure the customer understands the instructions.

   EXPLAIN

Ignition, Adjusting heat level, Fan Switch, Turning “OFF”.

COMMISSIONING

10

  

 INSTALLATION AND COMMISSIONING CHECKLIST

Complete the installation / commissioning checklist and the installer / gasfitter details on page 12 and
make sure that this instruction book is left with the customer.

NOTE:

RINNAI RESERVES THE RIGHT TO CHANGE OR MODIFY SPECIFICATIONS WITHOUT NOTICE.

Summary of Contents for IB35R

Page 1: ...ions Local Gas fitting regulations Municipal Building codes AGA Gas Installation Code AG601 NZ 5261 Any other relevant statutory regulation Rinnai strongly recommend that this product be installed wit...

Page 2: ...erials be present on the inside of the fireplace recess or flueway Note A Rinnai Zero Clearance kit is available where the heater is required to be installed in close proximity to combustible framing...

Page 3: ...scharge into the room The chimney must be free of soot and creosote accumulation resulting from previous slow combustion wood fires It must also be clear of all blockages and swept prior to installati...

Page 4: ...les F Soot Creosote accumulation G Structural deterioration H Loose or broken bricks I Smoke Pellet test Leakage FLUEING SEALING THE INBUILT INSTALLATION Peel protective backing off the foam strips su...

Page 5: ...heater is installed If the fire has to be removed the plate will pivot backwards to allow the heater to slide clear When a flue liner or Zero Clearance Box is used the flue protector plate must be un...

Page 6: ...pins of the Main Log as shown Gently place loose ember bed material in front of the front log Do not pour as dust particles from the plastic bag may block the burner ports Level it with a pencil or s...

Page 7: ...els All burner aeration is factory preset and cannot be adjusted If you are unable to get the unit to operate correctly refer to Troubleshooting on Page 4 before contacting your local service agent as...

Page 8: ...Z Tangential 2 Speed Watt Rating 90W Inside right hand side panel 11 SERVICE CONTACT POINTS RINNAI AUSTRALIA PTY LTD ACN 005 138 769 Helpline 1300 366 388 Mon Fri 8 30am 5 30pm EST Cost of a local cal...

Page 9: ...place 8 Has the appliance been commissioned 9 Is the end user fully aware of operating procedure NO YES INSTALLER GASFITTER DETAILS Company Name _______________________________________________________...

Reviews: