Start-up | 5
User and maintenance manual
73 / 148
5.2
Commissioning
NOTICE
Before switching on the kart, carefully read the instructions in chapter
this manual.
Ensure that all mechanical electrical work has been completed and that no persons
are standing inside the danger area of the kart.
All safety devices are installed, tested and ready for operation.
Checking battery charge and charging batteries
Fig. 46:
Drive switch and main switch
1 Main switch
2 Drive switch
3 Drive switch indicator
Fig. 47:
BMS LCD display and charger
1 Charger status display
2 Charger
3 Charging plug
4 BMS LCD display
The kart has been inspected for damage and technical defects and is in proper working order.
a)
Prop up the kart so that it drive wheels can turn freely.
WARNING! Ensure that nobody can become injured by rotating parts.
b)
Ensure that the
drive switch is pushed in (OFF position).
2
1
3