7 Maintenance
7-1. Maintenance intervals and items
- 36 -
Main Services
Power Supply
Check
: Checks the power supply voltage.
Verifies that the power lamp lights up.
(Verifies that relevant points can be identified on the system.)
(When a UPS (uninterruptible power system) is used, checks the operation with the UPS
(uninterruptible power system).)
Concentration
Display Check
: Verifies that the concentration display value is zero by using the zero gas.
Performs the zero adjustment (AIR adjustment) if the reading is incorrect.
Flow Rate Check : Checks the flow rate indicator to find abnormalities.
Checks the flow rate by using an external flow meter to verify the correctness of the flow rate
indicator on the gas detector. If the flow rate is incorrect, performs the flow rate adjustment.
Filter Check
: Checks the dust filter for dust or clogging.
Replaces a dirty or clogged dust filter.
Alarm Test
: Inspects the alarm circuit by using the alarm test function.
• Checks the alarm lamps. (Check each activation of ALM.)
• Checks the external alarm. (Checks the activation of the external alarm, such as a buzzer.)
Span
Adjustment
: Performs the sensitivity calibration by using the calibration gas.
Gas Alarm
Check
: Checks the gas alarm by using the calibration gas.
• Checks the alarm. (Checks the alarm activation when the alarm setpoint is reached.)
• Checks the delay time. (Checks time to delay until the alarm is triggered.)
• Checks the alarm lamps. (Check each activation of ALM.)
• Checks the external alarm. (Check the activation of external alarms, such as a buzzer and
reset signal.)
Cleaning and
Repair of the
Detector
(visual
diagnosis)
: Checks dust or damage on surface, cover, or internal parts of the detector, clean and repair
such parts of the detector.
Replaces parts which are cracked or damaged.
Detector
Operation
Check
: Uses the keys to check the operation of functions and parameters.
Replacement of
Consumable
Parts
: Replaces consumable parts, such as a sensor, filter and pump.
Summary of Contents for SD-1DRI-AS
Page 1: ...PT2E 2117 Smart transmitter Gas Detector Head SD 1DRI AS Operating Manual PT2E 196 PT2 196 ...
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 35: ......
Page 36: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 50: ......
Page 55: ...10 Product Specifications 10 1 List of specifications 53 Outline Drawings Adapter B NPT3 4 ...
Page 57: ...10 Product Specifications 10 1 List of specifications 55 Outline Drawings ...
Page 58: ......
Page 60: ......