Self-test and Warm-up
Make the following preparations before performance verification:
1.
Perform self-test to make sure that the instrument can work normally;
2.
Warm the instrument up for at least 30 minutes.
Self-test
Connect the instrument to AC power using the power cord provided with the
accessories. Turn on the power switch at the rear panel; then press the power key
at the front panel; the instrument starts and performs self-test. If the instrument
passes the self-test, the user interface is displayed; otherwise, the self-test error
prompt message is displayed.
You can press Utility
→
→
SelfTest
→
Test to perform self-test after the
instrument starts.
If the self-test fails, make sure that the problems are found and solved and the
instrument passes the self-test before performing the performance verification test.
Warm-up
Warm the instrument up for at least 30 minutes before performing the performance
verification test.