background image

4

DETAIL A

6

BEFORE BEGINNING

STEP 1

READ ALL THE INSTRUCTIONS

LEVELING GLIDE

1

A

PAGE 1 OF 2

.  ATTACH THE JOINER PLATES TO THE WORKSURFACE 

  , (2) IN EACH JOINER PLATE.  NO PILOT HOLES

VERSION DATED:  9/27/11

USING (4) WOOD SCREWS  

6

LEVEL

  

#2 SQUARE HEAD DRIVER BIT

  AS SHOWN BELOW IN DETAIL B.  ATTACH THE JOINER PLATES 

#2 PHILLIPS HEAD DRIVER BIT OR

PLATE.  NO PILOT HOLES ARE PROVIDED.

CORDLESS DRILL

TOOLS REQUIRED FOR ASSEMBLY:

ARE PROVIDED.  SEE DETAIL A.  DO NOT OVER-TIGHTEN THE SCREWS.  USE A 
LOW TORQUE SETTING ON THE DRILL.  

INSTRUCTION # 52702

STEP 2:  

CENTER (2) JOINER PLATES  

TO THE WORKSURFACES USING (4) WOOD SCREWS  

4

  ON THE END EDGES OF  OF THE 24"

  , (2) IN EACH JOINER

WORKSURFACES  

2

  THAT WILL BUTT THE STRAIGHT EDGE OF THE HALF MOON 

WORKSURFACE  

3

6

R-STYLE (2) 24" DEEP AND (1) 48" HALF MOON WORKSTATION ASSEMBLY 
INSTRUCTIONS:

STEP 1:  

AFTER ASSEMBLING THE 24" DEEP WORKSTATIONS  

1

  , CENTER (2)

JOINER PLATES  

4

  ON ONE OF THE WORKSTATIONS IN THE LOCATIONS SHOWN

BELOW LEFT IN 

STEP 1

ITEM # PART #

DESCRIPTION

QTY.

1

VARIES R-STYLE WORKSTATION 24" DEEP

2

2

VARIES 24" DEEP WORKSURFACE

2

3

10143 48x24 HALF MOON WORKSURFACE

1

4

800512 2 X 2 WORKSURFACE JOINER PLATE

4

5

29SL 29SL POST LEG

2

6

51708 M5 x 18mm SQ/PH/WSHR HEAD WOOD SCREW  24

6703 ZINSER ST., SCHOFIELD, WI 54476

PHONE: 800.298.4351 FAX: 866.882.9475

www.raproducts.com

K&A MANUFACTURING

DETAIL B

4

6

STEP 2

2

B

Reviews: