background image

2902

Declaration of conformity in accordance with ISO / IEC 17050-1

Manufacturer:

RIELLO S.p.A.

Address:

Via Pilade Riello, 7
37045 Legnago (VR)

Product:

Light oil burner

Model:

Gulliver RG5DF

These products are in compliance with the following Technical Standards:

EN 267

EN 12100

and according to the European Directives:

MD

2006/42/EC

Machine Directive

LVD

2006/95/EC

Low Voltage Directive

EMC

2004/108/EC

Electromagnetic Compatibility

Such products are marked as follows:

The quality is guaranteed by a quality and management system certified in accordance with UNI EN ISO 9001.

Legnago, 03.09.2014

Executive General Manager

RIELLO S.p.A. - Burner Department

Research & Development Director

RIELLO S.p.A. - Burner Department

Mr. U. Ferretti

Mr. R. Cattaneo 

Declaración de conformidad según ISO / IEC 17050-1

Fabricante:

RIELLO S.p.A.

Dirección:

Via Pilade Riello, 7
37045 Legnago (VR)

Producto:

Quemador de gasóleo

Modelo:

Gulliver RG5DF

Estos productos están conformes con las siguientes Normas Técnicas:

EN 267

EN 12100

y según lo dispuesto por las Directivas Europeas:

MD

2006/42/CE

Directiva Máquinas

LVD

2006/95/CE

Directiva Baja Tensión

EMC

2004/108/CE

Compatibilidad Electromagnética

Estos productos están marcados como se indica a continuación:

La calidad está garantizada mediante un sistema de calidad y management certificado según UNE EN ISO 9001.

Legnago, 03.09.2014

Director general

RIELLO S.p.A. - Dirección Quemadores

Director Investigación y Desarrollo

RIELLO S.p.A. - Dirección Quemadores

Ing. U. Ferretti 

Ing. R. Cattaneo  

CE - 0036 0325/01

CE - 0036 0325/01

Summary of Contents for Gulliver RG5DF

Page 1: ...instructions Instrucciones de instalaci n montaje y funcionamiento 2902902 3 10 2014 Light oil burner Quemador de gas leo CODE C DIGO MODEL MODELO TYPE TIPO 3739870 RG5DF 398T1 GB E Two stage operati...

Page 2: ...ent Director RIELLO S p A Burner Department Mr U Ferretti Mr R Cattaneo Declaraci n de conformidad seg n ISO IEC 17050 1 Fabricante RIELLO S p A Direcci n Via Pilade Riello 7 37045 Legnago VR Producto...

Page 3: ...justment 9 4 5 Pump pressure and air output 10 4 6 Burner start up cycle 10 5 MAINTENANCE 11 6 FAULTS SOLUTIONS 12 1 Pump 2 Electronic start delaying device 3 Control box 4 Reset button with lock out...

Page 4: ...reset function switch for post firing and recycle indicator LED reporting various operating stages green LED motor operating yellow LED pre heating stage red LED post combustion socket for remote res...

Page 5: ...n chamber featuring negative pressure up to 2 mbar according to the approval terms provided for in standard EN 746 2 for the whole unit com plete with equipment 247 159 300 213 160 190 12 5 36 285 345...

Page 6: ...heat generator door 3 using screws 5 and if necessary the nuts 2 inter posing the insulating gasket 4 see fig 2 After installation ensure that burner is lightly inclined as in fig 5 3 2 WORKING POSITI...

Page 7: ...re that the return pipe line is not clogged An excessive back pressure 1 bar would cause the damage of the pump seal with subsequent fuel leaks inside the burner The pump has a delivery pressure regul...

Page 8: ...ut occur prior to the arrival of the fuel await at least 20 seconds before repeating the operation In two pipe vacuum systems fig 10 the return line should terminate within the oil tank at the same le...

Page 9: ...5 4 pin plug 4 pole socket Blue Black White Blue Brown 2 1 3 2 1 M ELECTRONIC DELAYING DEVICE 2nd stage Motor thermostat M 1 2 1 2 3 M CARRIED OUT IN THE FACTORY 1st stage oil valve D4958 Limit thermo...

Page 10: ...ator With 60Hz power frequency the burner must be re set closing the air damper so that the amount of intake air is reduced 4 2 RECOMMENDED NOZZLES Delavan type W B Steinen type Q Danfoss type S NOTE...

Page 11: ...direction until the set point on the regulation rod 7 is level with the outside plane of the nozzle holder assembly 1 Figure 12 shows the head regulation rod 7 set on set point 3 According to the val...

Page 12: ...STMENT OF AIR SHUTTER see fig 15 Loosen the nut 4 turn the screw 5 until the indicator 6 is in the required position Tighten the nut 4 PRESSURE REGULATION This is set at 12 bar at the factory If requi...

Page 13: ...t obstructions or dents in the supply or return oil pipes Clean the filter in the oil suction line and in the pump Clean the photoresistance 8 fig 1 page 1 Check for correct fuel consumption Replace t...

Page 14: ...ntervention of un qualified personnel FAULTS POSSIBLE CAUSES SOLUTION The burner doesn t start when the limit thermostat closes Lack of electrical supply Check presence of voltage in the L1 N clamps o...

Page 15: ...9 4 4 Regulaci n de los electrodos 9 4 5 Presi n bomba y caudal de aire 10 4 6 Ciclo de puesta en marcha 10 5 MANTENIMIENTO 11 6 ANOMAL AS SOLUCIONES 12 1 Bomba de combustible 2 Retardador electr nic...

Page 16: ...i n de restablecimiento chispa interruptor para post encendido y recirculaci n led de se alizaci n de las distintas etapas de funcionamiento led verde funcionamiento motor led amarillo etapa de precal...

Page 17: ...de combusti n bajo vac o hasta 2 mbar seg n las condiciones de aprobaci n previstas por la norma EN 746 2 para el aparato entero equipado 247 159 300 213 160 190 12 5 36 285 345 1 1 99 99 127 4 5 4 5...

Page 18: ...s tornillos 5 y si es necesario las tuercas 2 interponiendo la junta aislante 4 ver fig 2 Cuando el montaje ha terminado comprobar que el quemador quede ligeramente inclinado ver fig 5 3 2 POSICI N DE...

Page 19: ...se de que el tubo de retorno del combustible no est obstruido Una contrapresi n excesiva 1 bar causa r a la rotura del rgano de estanquidad de la bomba con consiguientes p rdidas de com bustible adent...

Page 20: ...esperar el cebado Si la acci n de seguridad se produce antes de la llegada del combustible esperar como m nimo 20 segun dos y luego iniciar de nuevo esta operaci n En las instalaciones por depresi n d...

Page 21: ...o A fig 11 y extraer en la direcci n de la flecha despu s de desconectar todos los componentes el conector macho de 7 terminales y el hilo de tierra Cuando se vuelva a montar atornillar el tornillo A...

Page 22: ...as por el tipo de generador Si funcionara a 60Hz hay que retardar el quemador cerrando el registro de aire para reducir la cantidad de aire de entrada 4 2 BOQUILLAS ACONSEJADAS Delavan tipo W B Steine...

Page 23: ...de regulaci n 6 hasta que la muesca impresa en la placa de regulaci n 7 coincida con el plano exterior del grupo portaboquillas 1 En la figura 12 la placa de regulaci n del cabezal 7 est ajustada en...

Page 24: ...N DEL REGISTRO DEL AIRE ver fig 15 Afloje la tuerca 4 y mueva el tornillo 5 has ta colocar el indicador 6 en la posici n de seada Apriete la tuerca 4 REGULACI N PRESI N Se ajusta a 12 bar en f brica...

Page 25: ...alimentaci n y retorno del com bustible Efectuar la limpieza del filtro del conducto de aspiraci n del combustible y del filtro de la bomba Efectuar la limpieza de la fotoresistencia 8 fig 1 p g 1 Com...

Page 26: ...errar el term sta to de regulacion Falta de alimentaci n el ctrica Comprobar la tensi n en los bornes L1 N del conector macho de 7 termi nales Comprobar los fusibles Comprobar que el termostato de se...

Page 27: ......

Page 28: ...Subject to modifications Con la posibilidad de modificaci n RIELLO S p A I 37045 Legnago VR Tel 39 0442 630111 http www riello it http www riello com...

Reviews: