26
INSTALLATION
Automatic shut-off device (not supplied)
N
L
R HD E
br b
y/g
gr
bl o
MO4
MO5
RE
DAI
C
C
NC
NC
N
2
1
3
Ph
2
1
N
3
Ph
N HD E
N
⏚
⏚
⏚
RE
Timer relay (not supplied)
MO4
Terminal strip
MO5
Terminal strip
X6
6 pin burner connector (female)
XP6
6 pin burner connector (male)
DAI
Automatic shut-off device (not supplied as a
standard and valid only if required). The coil of the
automatic shut-off device (ASD) and the relay (RE)
must be chosen for a power supply of 230Vac.
The relay (RE) delays the closure of the fuel shut-off valve
(DAI), to prevent a void in the line section between the pump
and the valve.
2.13
Electrical connections
The
INSIEME EVOe 32 B/110 LN
boiler is fully cabled in the factory.
The only connections required for its installation are those of
the mains power supply, room thermostat and other optional
system components.
Proceed as follows to access the control panel terminals:
− open the control panel door and remove the fixing screw
(2);
− remove the front panel (1) and lift it by pulling it towards
yourself;
1
2
− remove the fixing screw (3) from the top of the control
panel;
3
Summary of Contents for 20118250
Page 1: ...cod 20129503 rev 3 06 2019 INSIEME EVOe 32 B 110 LN EN INSTALLATION AND MAINTENANCE MANUAL...
Page 61: ...61...
Page 62: ...62...
Page 63: ...63...