Overfill Prevention Valve

Mod. 442B

Ridart S.r.l. - Via Adua, 17 | 21045 Gazzada Schianno (Varese) - ITALY | [email protected]

INSTALLATION SCHEME

FUNCTIONING

The filling procedure consists of 

two stages

At the first stage the valve closes normally at ca. 95% of tank capacity. 
The second stage occurs after tank truck hose is drained, at ca. 98% of the storage tank capacity. 
At this point further delivery of fuel is not permitted and loading operation is completed. 
Scheme 2 shows the closing heights, the actual levels may vary by +/-20 ~ 30mm. 

Installation and User Ma

nual

INSTALLATION AREA

NOT RECOMMENDED

DANGER OF REACHING

LEVEL 2

The valve can be installed under the manhole lid of the tank in an existant 4” riser pipe or alternatively 
on 3” zinc-plated steel pipe, there is no need to remove the manlid. The valve can be pre-assembled in 
factory with aluminum drop tube, normally 150cm long, and riser pipe of the length according to the 
customer request. All pipes are BSP threaded.

INSTALLATION

Before proceeding with installation be sure that valve model is in compliance with local/national laws 
which regulate this specific device in relation to tank capacity requirements, normally 95%.
The overfill prevention valve is compatible with all commonly used hydrocarbons. In presence of fuel with 
a high concentration of ethanol (E85) please contact before our technical department.

In  order  to  prevent  product  spillage  from  the  storage  tank,  forecourt  workers  must  be  trained  and 
managed to inspect the loading adaptors and hoses for damaged or missing components. When loading 
equipment is not properly maintained or connections between adaptors and elbows or drain hose are 
not correctly performed fuel spills may result causing environmental contamination and explosion risk.

EN 13616:2004 