
RC Gate A Training
116
Slide 116
Points when conducting the
Transition Work
To conduct communication between the field and the Center in
the most efficient way possible.
9
This means continuing work without waiting for the next
hourly polling.
To be allowed Internet access at customer site.
9
To make it possible to operate both the RC Gate/RC Gate A
UI and the Center GUI at the customer site. However, the
technician needs access to the Administrator menu of the
Center GUI to complete all tasks.
Preconditions
Execute a Device Check Request Call from the appliance UI
each time a center command is created
(e.g. Device remove
request, Device Registration request, Parameter change request, etc.).
This prevents the need to wait for the next polling.
Remarks
Instead of a Device Check Request Call, a Service Test Call can also be made,
but this takes longer.
Summary of Contents for RC Gate A TTP
Page 2: ...RC Gate A Training 2 Slide 2 Overview of the Course No additional notes...
Page 4: ...RC Gate A Training 4 Slide 4 What is RC Gate A No additional notes...
Page 14: ...RC Gate A Training 14 Slide 14 Installation Step 1 Customer Pre Survey No additional notes...
Page 20: ...RC Gate A Training 20 Slide 20 Installation Step 3 Device Configuration No additional notes...
Page 65: ...RC Gate A Training 65 Slide 65 New Features IP Address Exclusion No additional notes...
Page 69: ...RC Gate A Training 69 Slide 69 New Features RFU Features RFU Remote Firmware Update...
Page 77: ...RC Gate A Training 77 Slide 77 New Features Auto Call Features No additional notes...
Page 80: ...RC Gate A Training 80 Slide 80 New Features Extended Device Search No additional notes...
Page 83: ...RC Gate A Training 83 Slide 83 Extended Device Search 3 No additional notes...
Page 84: ...RC Gate A Training 84 Slide 84 New Feature Ping Connection No additional notes...
Page 90: ...RC Gate A Training 90 Slide 90 New Feature User Code Counter Service No additional notes...
Page 101: ...RC Gate A Training 101 Slide 101 Correct Turning off Procedure No additional notes...
Page 106: ...RC Gate A Training 106 Slide 106 Replacement Procedures No additional notes...
Page 109: ...RC Gate A Training 109 Slide 109 Troubleshooting No additional notes...