Re-installation
1.
Before you re-install the flatbed unit on top of the machine, insert the wide flat cable
through the ferrite plate.
• It is very difficult to thread this flat cable through the plate after setting the flatbed unit and ADF
on top of the machine.
Removing the Fusing Unit
Preparation
Printer
( page 45)
• AIO
• Front cover
• Left cover
3in1
( page 45)
• AIO
• Front cover
• Left cover
4in1
( page 45)
• AIO
4. Replacement and Adjustments
66
Summary of Contents for M178-21
Page 2: ......
Page 24: ...22 ...
Page 71: ...6 Disconnect the thermistor harness 1 7 Disconnect the exit sensor 1 Basic Procedures 69 ...
Page 90: ...Friction Pad 1 Remove 3 screws 3 2 Release 2 tabs 2 4 Replacement and Adjustments 88 ...
Page 103: ...Solenoid 101 ...
Page 105: ...2 Remove the breaker switch screw A 1 3 Disconnect and remove the switch B 2 Switches 103 ...
Page 108: ...4 Replacement and Adjustments 106 ...
Page 190: ...5 System Maintenance Reference 188 ...
Page 221: ...MEMO 219 ...
Page 222: ...MEMO 220 EN ...
Page 224: ......
Page 226: ...2 ...
Page 250: ...MEMO 26 ...
Page 251: ...MEMO 27 ...
Page 252: ...MEMO 28 EN ...