Main Machine Installation (B286)
B286/B289 1-16
SM
11. Reattach the hinges and fasten the lock screws removed in Step 8.
Developer
1. Push up the buttons [1] to release the upper unit. Then open the upper unit [2].
2. Open the toner hopper cover [3].
3. Remove all tape and packing materials [4] in the upper unit.
4. Slowly pull out the drum protection sheet [5].
!
A developer lot number is embossed on the top edge of each package. Save
these top edges after you open each developer package. You will need these
numbers when you enter them later with SP2801-2 and -3.
Summary of Contents for B286
Page 1: ...B286 B289 SERVICE MANUAL 003165MIU...
Page 2: ......
Page 3: ...B286 B289 SERVICE MANUAL...
Page 4: ......
Page 5: ...B286 B289 SERVICE MANUAL 003165MIU...
Page 6: ......
Page 8: ......
Page 10: ......
Page 12: ......
Page 27: ......
Page 29: ......
Page 34: ......
Page 35: ...INSTALLATION...
Page 36: ......
Page 117: ...PREVENTIVE MAINTENANCE...
Page 118: ......
Page 127: ...REPLACEMENT AND ADJUSTMENT...
Page 128: ......
Page 186: ...Boards B286 B289 3 58 SM 9 Remove the shield cover A x12 10 Remove A MCU x4 x1 B IPU x4...
Page 198: ...Others B286 B289 3 70 SM 4 Remove the cooling fan D x 1 x 3...
Page 216: ......
Page 217: ...TROUBLESHOOTING...
Page 218: ......
Page 269: ...SERVICE TABLES...
Page 270: ......
Page 507: ...DETAILS...
Page 508: ......
Page 511: ...Overview SM 6 3 B286 B289 Details 6 1 2 MECHANICAL COMPONENT LAYOUT...
Page 526: ...Image Processing B286 B289 6 18 SM Text Mode...
Page 529: ...Image Processing SM 6 21 B286 B289 Details Patched Original Mode...
Page 530: ...Image Processing B286 B289 6 22 SM Generation Mode...
Page 552: ...Development B286 B289 6 44 SM Toner End Recovery Flow Chart...
Page 613: ...SPECIFICATIONS...
Page 614: ......