Series MNKA bearing pedestal assembly 4
Page 21
9250-003-en
Revision 01
TM 10458
Published 06/2022
♦
Screw the eye bolts into the holes on plain
bearing pedestal
339
.
♦
Insert impeller
230
into bearing bush
545/x
of
plain bearing pedestal
339
.
♦
Lower impeller
230
fully into bearing bush
545/x
of plain bearing pedestal
339
.
♦
Lift plain bearing pedestal
339
together with im-
peller
230
using the 3-strand sling chain and
make sure that the square engages in the seat
of plain bearing bush
545/x
.
♦
Apply Loctite 243 (blue) as threadlocker to the
thread of impeller shaft
230
.
♦
Apply 1 drop of adhesive to the shaft thread.
♦
Place bearing bush
545/x
in pump rotor
859
.
Caution! Dry running
If necessary, spray the ceramic
component
545/x
with Lexo spray
(soapy water).