Series MNK pedestal group 4
Page
21
9230-003-en
Revision 19
TM 10458
Edition 06/2022
♦
Lower the pump shaft
211
with the impeller
230
fully
in the bearing bush
545/x
of the plain bearing ped-
estal
339
.
♦
Lift the plain bearing pedestal
339
with the pump
shaft
211
and impeller
230
with the 3-leg chain sling
and make sure, that the square fits in the plain bear-
ing bush
545/x
.
♦
As threadlocking provide the thread of the pump
shaft
211
with Loctite 243 (blue).
♦
Provide the shaft thread with 1 drop of adhesive.
♦
Put the bearing bush
545/x
in the inner magnet as-
sembly
859
.
Caution! Dry-running
If necessary provide the ceramic compo-
nent
545/x
with Lexo Spray (soapy wa-
ter).
♦
Lower the plain bearing pedestal
339
with pump
shaft
211
and impeller
230
on the inner magnet as-
sembly
859
.