Richter BVA Series Installation And Operating Manual Download Page 12

Series   KNA/F, KNAP/F, 

KNA-D/F, KNAP-D/F,

 

Page 12 

 

KNA-S, KNAP-S, 

ASME

 

 

9520-080-en_USA 

Revision  15 

TM 9549

 

Edition  07/2016 

9  Maintenance 

  All  repair  work  is  to  be  performed  by  qualified 

personnel  using  the  appropriate  tools.  Generally 

recognised practice in mechanical engineering is 

to be observed.  

  For  the  arrangement,  designation  and  item 

numbers of all parts of the valve, see 

Chapter 10

.  

  Spare parts are to be ordered with all the details 

in acc. with the valve identification. 

  Only original spare parts may be installed. 

  To prevent leaks, a regular check of the connec-

tion screws should be made in line with the oper-

ating requirements. 

For torques see 

Chapter 1.3

 

 

9.1  Dismantling ball valve with 

ball/stem unit 

 

9.1.1  Ball valve with lever 

  Remove lever 

203

  Take out grounding spring washer  

557

  Dismantle packing gland follower 

503

 and spring 

gland follower 

502

  The  thrust  ring 

405/1,

  packing  bellows 

403

  and 

retaining  washer 

526

 (not  in  6" 8“/6“ and 8”) are 

one unit and it is levered out using 2 screwdrivers. 

  Undo  screw  connection  body  end  piece 

102

  / 

main body 

100

  Remove body end piece 

102

  Remove ball/stem unit 

201

 in closed position. Pay 

attention so as not to damage the body lining. 

  Remove seat rings 

401

 

 

9.1.2  Packing bellows  

  Remove retaining washer 

526

  Separate  thrust  ring 

405/1

  and  packing  bellows 

403

 by pushing them apart. 

 

 

9.1.3  Ball valve 

with actuator

 

  Remove actuator 

850

 and coupling 

804

  Dismantle packing gland follower 

503

 and spring 

gland follower 

502

  Remove bracket 

510

Further  dismantling  is  performed  as  described  in 

Chapter 9.1.1 and 9.1.2

 

 

9.2  Assembly with ball/stem unit 

  Prior to assembly all parts are to be cleaned and 

the plastic-lined components checked for damage. 

  Insert  seat  rings 

401

  in  the  main  body 

101

  and 

body end piece 

102

  Mount  ball/stem  unit 

201

  in  closed  position.  Pay 

attention so as not to damage the body lining. 

  An  additional  bore  in  the  ball/stem  unit,  e.g.  to 

ensure it is cavity-free, must lie on the p1 side in 

the closed position. See also 

Chapter 6.2

  Mount  body  end  piece 

102

.  Tighten  the  body 

screws to a tightening torque according to 

Chap-

ter 1.3

 in diametrically opposite sequence. 

 

 

9.2.1  Packing bellows  

  Press thrust ring 

405/1

 into packing bellows 

403

  Install  retaining  washer 

526

  (not  in  6”,  8“/6“  and 

8”). 

  Press unit into main body 

101

  Press in grounding spring washer 

557

 

 

9.2.2  Ball valve 

with lever

 

  Mount lever stop 

577

, spring gland follower 

502

 (at 

3", 4", 6", 8“/6“ and 8” are 2 spring gland followers) 

and  packing  gland  follower 

503

.  Tighten  packing 

nuts until there  is no  gap  between  packing gland 

follower  and  spring  gland  follower.  See 

Chapter 

1.3

 

and 10.2

  Seal any tapped bores still open with plugs. 

  Mount lever 

203

 

 

9.2.3  Ball valve with actuator 

  Mount spring gland follower 

502

 (at 3", 4", 6", 8“/6“ 

and  8”  are  2  spring  gland  followers)  and  packing 

gland  follower 

503

.  Tighten  packing  nuts  until 

there  is  no  gap  between  packing  gland  follower 

and  spring  gland  follower.  See 

Chapter  1.3  and 

10.3

  Mount bracket 

510

 with the opening at right angles 

to  the  direction  of  flow.  See  sectional  drawing  in 

Chapter 10.3 and 10.7

  Mount  coupling 

804

  and  actuator 

850

.  Observe 

the actuator position in accordance with the actua-

tor operating manual. 

  Observe the ball/stem position in accordance with 

the position of the actuator. 

Summary of Contents for BVA Series

Page 1: ...te the valves beyond the stated pressure and temperature ratings Misuse improper installation and improper maintenance may result in personal injury and or property damage Use only valve components co...

Page 2: ...enance 12 9 1 Dismantling ball valve with ball stem unit 12 9 1 1 Ball valve with lever 12 9 1 2 Packing bellows 12 9 1 3 Ball valve with actuator 12 9 2 Assembly with ball stem unit 12 9 2 1 Packing...

Page 3: ...h one piece ball stem unit with plastic coating Al2O3 ball and stem full port maintenance free self adjusting Richter ENVIPACK universal packing seat rings of pure PTFE cavity reduced as standard feat...

Page 4: ...g components Ball stem unit Al2O3 ball stem Options Richter ENVIPACK double packing for particularly high safety requirements self adjusting On request monitoring and flushing connection Ball stem uni...

Page 5: ...2 35 310 4 x M12 35 310 1 4 x M12 35 310 1 4 x M16 45 400 2 4 x M16 45 400 3 6 x M16 50 445 4 6 x M20 60 531 6 8 x M20 150 1335 8 6 8 x M20 150 1330 8 12 x M24 175 1549 1 4 Breakaway torques Test medi...

Page 6: ...07 2016 1 6 Pressure temperature diagram When used in the area of application of ASME the low temperature of ASTM A395 is limited to 20 F 29 C When used in the minus temperature range the regulations...

Page 7: ...t off of fluids The valves are suitable for vapours gases and non boiling liquids of group 1 according to the PED and have a corrosion resistant plastic lining Solids can lead to increased wear damage...

Page 8: ...uation and filling the formation of an explosive atmosphere must be prevented e g by superimposing a layer of nitrogen It is recommended to wait 1 hour before removing the valve from the plant in orde...

Page 9: ...tilated room at as constant a temperature as possible Elastomers are to be protected against UV light In general a storage period of 10 years should not be exceeded 5 2 Return consignments Valves whic...

Page 10: ...om the Richter product range 6 2 Direction of flow and installation position Installation is independent of the direction of flow Any installation position can be chosen Otherwise it is marked by a di...

Page 11: ...age 7 3 Shutdown The local regulations are to be observed when dismantling the valve Prior to undoing the flange connection ensure that the plant is depressurised and emtied Prior to starting any repa...

Page 12: ...ibed in Chapter 9 1 1 and 9 1 2 9 2 Assembly with ball stem unit Prior to assembly all parts are to be cleaned and the plastic lined components checked for damage Insert seat rings 401 in the main bod...

Page 13: ...aned and the plastic lined components checked for damage Insert seat rings 401 in the main body 101 and body end piece 102 Insert stem 202 from inside into the main body 101 In the case of 6 and 8 6 w...

Page 14: ...nce with the actua tor operating manual Mounting dimensions see drawing 9520 00 4018 10 Drawings 10 1 Legend 101 main body 102 body end piece 200 ball 201 ball stem unit 202 stem 203 lever lockable 40...

Page 15: ...15 KNA S KNAP S ASME 9520 080 en_USA Revision 15 TM 9549 Edition 07 2016 10 2 Sectional drawing ball valve with ball stem unit and lever 10 2 1 Ball valve with ball stem unit and lever 8 6 Holes of th...

Page 16: ...Series KNA F KNAP F KNA D F KNAP D F Page 16 KNA S KNAP S ASME 9520 080 en_USA Revision 15 TM 9549 Edition 07 2016 10 2 2 Ball valve with ball stem unit and worm gear 8...

Page 17: ...KNAP F KNA D F KNAP D F Page 17 KNA S KNAP S ASME 9520 080 en_USA Revision 15 TM 9549 Edition 07 2016 10 2 3 Ball valve with ball stem unit and actuator Holes of the flange and housing screws view dis...

Page 18: ...A F KNAP F KNA D F KNAP D F Page 18 KNA S KNAP S ASME 9520 080 en_USA Revision 15 TM 9549 Edition 07 2016 10 2 4 Ball valve with ball stem and lever Holes of the flange and housing screws view displac...

Page 19: ...KNA D F KNAP D F Page 19 KNA S KNAP S ASME 9520 080 en_USA Revision 15 TM 9549 Edition 07 2016 10 2 5 Sectional drawing ball valve with ball stem and actuator Holes of the flange and housing screws v...

Page 20: ...3 View and section ball valve with lever View Z Section B B Tighten packing gland follower 503 until spring gland follower 502 is in contact without any gap 10 4 Sections ball valve with actuator Sec...

Page 21: ...56 75 81 94 107 130 223 5 228 5 HL inch 7 05 10 2 16 1 20 17 mm 179 259 410 512 5 H inch 4 94 6 29 6 39 8 09 8 72 11 18 mm 125 5 159 5 162 5 205 5 221 5 284 H1 inch 1 97 3 03 3 14 4 64 5 27 7 24 9 33...

Page 22: ...Series KNA F KNAP F KNA D F KNAP D F Page 22 KNA S KNAP S ASME 9520 080 en_USA Revision 15 TM 9549 Edition 07 2016 10 5 2 Ball valve with gear 8...

Page 23: ...F KNAP F KNA D F KNAP D F Page 23 KNA S KNAP S ASME 9520 080 en_USA Revision 15 TM 9549 Edition 07 2016 10 5 3 Ball valve with actuator Dimensions H3 H4 L1 L2 and L3 vary depending on the actuator ma...

Page 24: ...69 74 112 130 180 238 B1 inch 4 29 5 43 5 82 9 44 11 81 14 96 17 32 mm 109 138 148 240 300 380 440 port inch 0 59 0 79 0 96 1 50 1 87 3 07 3 78 5 71 5 71 7 68 mm 15 20 24 5 38 37 5 78 96 145 145 195...

Page 25: ......

Page 26: ...er Betriebsanleitung Insbesondere sind regelm ige Wartungsintervalle durchzuf hren und die dichtheitsrelevanten Schraubverbindungen zu berpr fen und wenn notwendig nachzuziehen meets the requirement r...

Page 27: ...129 FIT SD 14 FIT DU 108 FIT DD 36 FIT SFF 62 5 PFDAvg 4 73 10 4 for TProof 1 year MTBF 398 years Safety Intigrity Level SIL 2 Usable lifetime According to IEC 61508 2 7 4 7 4 values of up to 10 years...

Page 28: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Page 29: ...hich cleaning method radioactive 3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence...

Page 30: ...spection repair of Richter products and parts will only take place if the attached explanation is filled out correctly and completely by authorized and qualified technical personnel and is available I...