Elevated Load Cell Stands
8
Visit our website
6. Attach the lock washers and nuts to secure the bolts.
Place one bolt in both the top and bottom overlapping extremes and place other bolts equally between.
Figure 2-3. Height Bolt Installation
7. Repeat the height adjustment steps for each weigh stand mount.
Final height adjustment will need to be done when weigh stands are installed to the floor. See
.
2.6 Support Brace Installation
The ELS weigh stands require two support braces to be installed to the stands. A support brace is made up of an outer
adjustable tubing and an inner adjustable tubing. The load cells must be positioned to the same orientation when installing the
support braces on the weigh stands. If the distance between each weigh stand is less than 3 ft, only the outer support brace is
needed for the installation of the support brace (
).
2.6.1 Conveyor Applications Greater Than 3 Feet
1. Measure the length of the conveyor frame to determine the length for the support braces.
The conveyor needs to overhang weigh stand 3-6 inches at each end.
2. Insert the inner adjustable tubing into the outer adjustable tubing.
3. Align the ends of the support braces to the provided holes on the weigh stands.
The load cells must be in the same orientation before installing the support braces on the weigh stands.