OPERATION
4211-4211SS MSL 01/11
Operation Section 4-12
© 2011 Alamo Group Inc.
OPERA
T
ION
6.2 Loader Pre-Operation Inspection and Service
Before operation, a complete inspection and service is required to ensure the loader is in a good and safe
working condition. Damaged and/or broken parts should be repaired and/or replaced immediately. To ensure
the loader is ready for operation, conduct the following.
OPS-L-0027
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
Avoid contact with hot surfaces including hydraulic oil tanks, pumps, motors, valves and
hose connections. Relieve hydraulic pressure before performing maintenance or repairs.
Use gloves and eye protection when servicing hot components. Contact with a hot surface
or fluid can cause serious injury from burns or scalding.
(SG-34)
Do not operate this Equipment with hydraulic oil or fuel leaking. Oil
and fuel are explosive and their presence could present a hazard. Do
not check for leaks with your hand! High-pressure oil streams from
breaks in the line could penetrate the skin and cause tissue damage
including gangrene. To check for a hose leak, SHUT the unit ENGINE
OFF and remove all hydraulic pressure. Wear oil impenetrable gloves,
safety glasses and use Cardboard to check for evidence of oil leaks. If
you suspect a leak, REMOVE the HOSE and have it tested at a Dealer.
If oil does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure.
(SG-15)
Summary of Contents for LOADER 4211 MSL
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 28: ......
Page 29: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 34: ......
Page 35: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 46: ......
Page 47: ...Operation Section 4 1 OPERATION SECTION...
Page 90: ......
Page 91: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 100: ...MAINTENANCE 4211 4211SS MSL 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE...
Page 101: ...MAINTENANCE 4211 4211SS MSL 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 104: ...4211MSL 4211SS MSL SOM 01 11 P N F 3735C Printed U S A 4211 MSL 4211SS MSL LOADER...