OPERATION
TR308 04/21
Operation Section 4-44
O
PE
R
AT
IO
N
@ 2021 Alamo Group Inc.
Before transporting the tractor on a public roadway
or boarding a trailer for transport, the tractor brake
pedals should be locked together. Locking the
pedals ensures that both wheels brake
simultaneously while stopping, especially when
making an emergency stop.
Use extreme caution and avoid hard applications of
the tractor brakes when towing heavy loads at road
speeds. Never tow the implement at speeds greater
than 20 MPH (32 kph). OPS-U- 0018str
13.1 Tires and Wheels
Laminated Sectional Tires
are designed for conditions where puncture proof performance is required and the
mower will not be transported for long distances on roadways. Transport speed for laminated tires should not
exceed 20 MPH. Excessive speed can cause damage to the machine and tire sections. Sectional tires must be
installed such that the rubber segments lay with the ground.
OPS-R-0035_I str
Summary of Contents for FC-0110
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2021 Alamo Group Inc SAFETY SECTION ...
Page 31: ...SAFETY TR308 04 21 Safety Section 1 21 SAFETY 2021 Alamo Group Inc DECAL DESCRIPTION ...
Page 32: ...SAFETY SAFETY TR308 04 21 Safety Section 1 22 2021 Alamo Group Inc ...
Page 33: ...SAFETY TR308 04 21 Safety Section 1 23 SAFETY 2021 Alamo Group Inc ...
Page 34: ...SAFETY SAFETY TR308 04 21 Safety Section 1 24 2021 Alamo Group Inc ...
Page 35: ...SAFETY TR308 04 21 Safety Section 1 25 SAFETY 2021 Alamo Group Inc ...
Page 36: ...SAFETY SAFETY TR308 04 21 Safety Section 1 26 2021 Alamo Group Inc ...
Page 37: ...SAFETY TR308 04 21 Safety Section 1 27 SAFETY 2021 Alamo Group Inc ...
Page 38: ...SAFETY SAFETY TR308 04 21 Safety Section 1 28 2021 Alamo Group Inc ...
Page 39: ...SAFETY TR308 04 21 Safety Section 1 29 SAFETY 2021 Alamo Group Inc ...
Page 41: ...Introduction Section 2 1 2021 Alamo Group Inc INTRODUCTION SECTION ...
Page 46: ......
Page 47: ...Assembly Section 3 1 2021 Alamo Group Inc ASSEMBLY SECTION ...
Page 59: ...Operation Section 4 1 2021 Alamo Group Inc OPERATION SECTION ...
Page 107: ...Maintenance Section 5 1 2021 Alamo Group Inc MAINTENANCE SECTION ...
Page 110: ...MAINTENANCE TR308 04 21 Maintenance Section 5 4 MAINTENANCE 2021 Alamo Group Inc ...
Page 111: ...MAINTENANCE TR308 04 21 Maintenance Section 5 5 MAINTENANCE 2021 Alamo Group Inc ...
Page 112: ...MAINTENANCE TR308 04 21 Maintenance Section 5 6 MAINTENANCE 2021 Alamo Group Inc ...
Page 127: ...MAINTENANCE TR308 04 21 Maintenance Section 5 21 MAINTENANCE 2021 Alamo Group Inc ...
Page 133: ...SEGURIDAD SEGURIDAD TR308 04 21 Safety Section 1 28 2021 Alamo Group ...
Page 134: ...SEGURIDAD TR308 04 21 Safety Section 1 27 SEGURIDAD 2021 Alamo Group ...
Page 135: ...SEGURIDAD SEGURIDAD TR308 04 21 Safety Section 1 26 2021 Alamo Group ...
Page 136: ...SEGURIDAD TR308 04 21 Safety Section 1 25 SEGURIDAD 2021 Alamo Group ...
Page 137: ...SEGURIDAD SEGURIDAD TR308 04 21 Safety Section 1 24 2021 Alamo Group ...
Page 138: ...SEGURIDAD TR308 04 21 Safety Section 1 23 SEGURIDAD 2021 Alamo Group ...
Page 139: ...SEGURIDAD SEGURIDAD TR308 04 21 Safety Section 1 22 2021 Alamo Group ...
Page 140: ...SEGURIDAD TR308 04 21 Safety Section 1 21 SEGURIDAD 2021 Alamo Group ...
Page 141: ...SEGURIDAD SEGURIDAD TR308 04 21 Safety Section 1 20 2021 Alamo Group ...
Page 142: ...SEGURIDAD TR308 04 21 Safety Section 1 19 SEGURIDAD 2021 Alamo Group ...
Page 143: ...SEGURIDAD SEGURIDAD TR308 04 21 Safety Section 1 18 2021 Alamo Group ...
Page 160: ...Safety Section 1 1 2021 Alamo Group SECCIÓN DE SEGURIDAD ...
Page 161: ......