
Address
:
S603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
18
Custom TP Button
1. Push the [MENU] button, and enter to the menu items. Turn the rotary knob, and select <SYSTEM>.
2. Push the knob to confirm. Turn the rotary knob, and select <Customized Button>, push the knob to confirm.
3. Push and turn the rotary knob, TP and BLACK can be selected.
If select <TP>, push [BLACK/TP] button, the button is lit, and enter to the TP menu items.
Port:
Select the port.
Test Grid:
Select “On” or “Off”.
Automatic: The test grid automatically matches the port, based on the LEDs/Row and Column.
Manual size: Set the width and height of each cell in the test grid.
Grid Color:
Assign the grid color.
BACKUP
>>
TEST PATTERN
>>
->SYSTEM
>>
FACTORY RESET
>>
OLED Brightness
12
Front Panel Lock
>>
->Customized Button
>>
Tech Support
>>
Customized Button
->TP
TP
->Port
Port 1
Test Grid Off
Grid Color Red
Type Cross
->Test Patterns Auto Move
Moving 30
Patterns Color White