RGB Networks BNPxr Quick Reference Download Page 1

 Broadcast Network Processor 

(BNP)  Quick Reference

Parts List

Before you begin the installation of the BNP you will need the 
following items.
Included items:

Populated BNP chassis
AC power cord, included if AC power supply is used
DC connector cables, if DC power supply is used
Front and rear rack mount brackets
22 rack mount bracket screws
1 M4 grounding nut

Other required items (not included):

Phillips screwdriver
8 rack mount screws
Crossover cable long enough to connect the BNP 
and the management workstation 
Workstation for configuration 
1 or more Gigabit Ethernet copper or optical SFP 
modules









Rack Mount the BNP

Using the provided screws, attach the front rack mount 
bracket to one side of the chassis, then attach the rear rack 
mount  bracket. Repeat on the other side of the chassis.
Secure the front of the chassis to the rack. Connect the 
rear rack mount extensions between the rear rack mount 
brackets and the  rack.
Slide the mounting brackets to the correct distance and 
secure  them.
Ground the chassis. 

1.

2.

3.

4.

Connect the Ports

Use the correct cable for the port type and your network 
configuration:

10/100BaseT Gigabit Ethernet port,  used to communicate with  

     an external  console.

ASI ports, located on the rear of the chassis. Use a push/twisting  

    motion to ensure proper seating of the cables, shown in closeup.

The  Gigabit Ethernet ports must have approved SFPs before 

    cabling.

The BNP can be used with between one and  four modules, 
depending on your requirements. 

ASI

ASI

ASI

Slot C

rear of chassis

Port#
  1     2   3    4    5    6 

Slot D

Slot A

Slot B

Recommended SFPs

Tyco

1382392-3: 
Multi mode 850 nm, 1 GigE, LC Optical transceiver
1511094-3:
 Single mode 1310 nm, 1 GigE, LC Optical transceiver

Finisar 

FCMJ-8521-3: 
Active copper SFP
FTRJ1319P1BTL:
 Single mode 1310 nm, 1GigE, LC optical transceiver
FTRJ8519P1BTL: 
Multi mode 850 nm, 1GigE, LC optical transceiver

Copyright 2005-2006 RGB Networks. All rights reserved.

Start Here

1

2

3

Install recommended SFPs according to the manufacturer’s      
instructions.

4

Twelve Steps to Installing and Configuring the BNP

Attach the rear mounting 
bracket to the BNP chassis (A) 
and then to the rack (B)

A

B

Attach the BNP 
chassis to the 
front of the rack

Rear of BNP (AC power shown)

Front of BNP

ASI Ports

GigE Ports

Reviews: