![REX RKF 130 General Information Manual Download Page 29](http://html.mh-extra.com/html/rex/rkf-130/rkf-130_general-information-manual_1449159029.webp)
RKF 130
Transport, setup, installation
Version 1.1
Page 29 of 128
3.8
INITIAL OPERATION
•
Electrical connection
Pay attention to the label on feed cable without fail.
Instructions for installation and start-up:
Installation and start-up work may be carried out only by qualified electricians
or by instructed experts who have been trusted with the mode of operation,
in compliance with the valid nations regulations e.g. EN 60204
Safety measures and safety equipment must comply with the valid national
regulations and standards e.g. EN 50178 and EN 60204
The leakage current can be greater than 3.5 mA AC and 10 mA DC!
Nominal voltage of the piston filler: _______________ V
Back-up fuse: ________________ A