QuickGuide-DoorFan-Q5E
Page
1
of
1
•
Read and experiment with each step
•
To perform automatic or multi-point tests*, refer to
the Door Fan Software Manual and the DM-2
Operator’s Manual
*Tests for CGSB 149, LEED, ASTM E778, ASTM 1827,
EN13829, and ATTMA TS-1 may require more elaborate steps
and training. This guide is intended for familiarization with the
controls.
For the latest Retrotec documentation, visit us at:
http://www.retrotec.com/info/
1 Charge batteries for 12 hours
1.1
Plug in the battery charger or the power
connection from the fan.
1.2
Install 4 NiMH AA batteries.
1.3
Press
[On] [Exit]
to start the
DM-2 and to clear the intro
screen.
1.4 Charge batteries until full (up
to 12 hr.) and disconnect the
battery charger.
See:
QuickGuide-DM2MkII
2 Set up the building
2.1
Close the outside doors and windows.
2.2
Open all interior doors leading to conditioned
spaces.
2.3
Shut off HVAC (exhaust fans, dryers, A/C,
furnaces).
2.4
Turn gas hot water to pilot.
2.5
Place paper over any open ashes.
2.6
Select doorway for door panel.
3 Connect the DM-2
3.1
Remove the fan from its case, close the lid.
3.2
Place DM-2 on top of the fan case.
3.3
Connect the yellow, green, and red tubes to
the yellow, green and red ports. Connect the
yellow control cable as shown.
Note
Run the DM-2 on batteries until the indicator displays 1/4
charge, and then recharge fully, to increase battery life.
Cover ashes with paper
Close all windows
Gas valve to Pilot
See:
QuickGuide-DM2MkII
4 Install modular door panel
4.1
Unpack the door panels.
4.2
Install the panels securely on
the door frame.
See:
QuickGuide-DoorPanel-Modular.
QuickGuide-DoorFan-Q5E.doc
rev- 2009-10-14