RGH24/25U series readhead
Installation guideM-9541-0084-04-C
Page 1: ...RGH24 25U series readhead Installation guide M 9541 0084 04 C...
Page 2: ...r M 9517 2855 These can be downloaded from our website www renishaw com encoder and are also available from your local representative This document may not be copied or reproduced in whole or in part...
Page 3: ...mark sensor limit switch sensor position Optical centreline A 9541 0037 Reference mark actuator 4 8 2 Mounting holes M3 x 0 5 through Set up LED 5 4 3 17 JST connector version 12 8 5 5 Arrow indicates...
Page 4: ...ashes orange or goes blank the reference mark adjuster screw should be turned anti clockwise by 1 8 turn and the procedure repeated until a red flash is obtained RGH24 Red Orange Blank LED flash durin...
Page 5: ...ued RGH25 RGB25 Red Orange Blank LED flash during reference mark traverse only turn 1 8 RGB25 input all models Function Power Incremental signals Reference mark Not connected Sin monitor Cos monitor S...
Page 6: ...forced open circuit for 20 ms when signal too low for reliable operation For RGH24W Y H I O incremental channels forced open circuit for 10 ms when signal too low or speed too high for reliable operat...
Page 7: ...dheads have been designed to the relevant EMC standards but must be correctly integrated to achieve EMC compliance In particular attention to shielding arrangements is critical Renishaw recommends the...
Page 8: ...Check valid options online at www renishaw com epc Readhead part numbers A Options 00 Standard RGH24B C D X and Z only 01 JST connector RGH24D X and Z only 30 12 MHz customer clock RGH24H I O and Y o...
Page 9: ...de contact details please visit our main website at www renishaw com contact RENISHAW and the probe emblem used in the RENISHAW logo are registered trademarks of Renishaw plc in the UK and other count...