
UM-B-041
SmartBond Production Line Tool
User Manual
Revision 4.8
02-Nov-2022
CFR0012
37 of 170
© 2022 Renesas Electronics
Table 12: SmartBond_PLT_CLI.exe Application Execution
Step
Description
1
To successfully start the
SmartBond_PLT_CLI.exe
application, the
SmartBond_PLT_CFG.exe
should be
executed first, in order to set up the system and perform the required tests. See
2
Go to folder '
executables
'. This folder should contain the following files and sub-folders.
3
Double click the
SmartBond_PLT_CLI.exe
application executable. The following initial screen will
appear.
4
Type '
s
' then click Enter. The preconfigured tests and memory actions will start to be executed.
Table 13: GU_fw_upgrade.exe Application Execution
Step
Description
1
GU_fw_upgrade.exe
can be started by either opening the application from the executables folder or
by pressing the
‘
Upgrade GU Firmware
’
button in the
PLT Hardware Setup
tab in
SmartBond_PLT_CFG.exe.