
Legend for circuit diagrams
Color codes:
bl:
blue
br:
brown
ge:
yellow
gn:
green
rt:
red
sw:
black
ws:
white
Other
abbreviations:
EVU:
Utility
Gem.:
Mixed
HK:
Heating cycle
HZG:
Heater
Imp.:
Impulse
PV:
Photovoltaics
PWM:
Pulse width modulation
RL:
Return
Ungem.:
Unmixed
VL:
Inlet
WW:
Hot water
Zirk.
Circulation
10
Commissioning
10.1
Control panel and
information on commissioning
The Smart Control is used to operate and control
the entire heating system. The Smart Control is
operated from the operating unit. The operating
unit is positioned on the basic device.
n
The unit is pre-installed at the factory. After a
reset of the Smart Control, the default parame-
ters are loaded.
n
An intensive visual inspection is to be carried
out before the actual commissioning.
n
Switch on the power supply.
n
Then the preinstalled data is loaded and the
parameters can be set with the help of the
commissioning wizard. You can find informa-
tion on this in the separate operating instruc-
tions of the Smart Control.
NOTICE!
Before commissioning the domestic water
storage will be filled.
REMKO WKF / WKF-compact
68