5.2 Commissioning wizard
When starting the controller for the first time the commissioning assistant is started in order to implement the
basic programming of the existing system. After commissioning has been fully completed, the default set of
parameters is enabled. During the first heating period, the thermal characteristics of the system should be
observed, and the parameters optimised as necessary.
The following parameters are enabled according to the installed heat pump and components.
The parameters of the installation level must be enabled on the heat pump and a number of these must be
adjusted to the site configuration.
Setting the country
Please confirm this parameter in order to load the country-specific settings. The selection of the country
determines the setting for the date format, units of measurement and temperature limits. All settings can be
modified at a later date.
Setting country and country-specific settings
Menu item
Parameter
Factory setting
Country
Germany
Germany
Österreich
Schweiz
United States
United Kingdom
Nederland
Belgique
Luxembourg
France
Espana
Portugal
Italia
Greece
Norge
Sverige
Suomi
Polska
Cesko
Slovensko
REMKO Smart-Control Touch
84