REMKO EWS 200 E Assembly And Operating Instructions Manual Download Page 11

2.2  Unit dimensions

EWS 200E

3

4

A

B

C

D

E

1

6

2

4

4

5

7

8

9

Fig. 1: Unit dimensions (all measurements in mm)

1: Magnesium anode

2: Venting

3: PU insulation

4: Probe sleeve

5: Sealing plug

6: Thermometer

7: Tilt height

8: Cleaning opening

9: Insertion dimension

A: Hot water

B: Inlet

C: Circulation

D: Return flow

E: Cold water

We reserve the right to make technical changes for the purpose of technical advancement.

 

 

 

 

 

11

Summary of Contents for EWS 200 E

Page 1: ...Assembly and operating instructions Read the instructions prior to performing any task REMKO storage tank systems EWS 200E 300E 500E Storage tank for domestic hot water 0191 2018 08 Edition 1 en_GB...

Page 2: ...g inal Read these operating instructions carefully before commis sioning using this device These instructions are an integral part of the system and must always be kept near or on the device Subject t...

Page 3: ...8 Unauthorised modification and changes 5 1 9 Intended use 5 1 10 Warranty 5 1 11 Transportation and packaging 5 1 12 Environmental protection and recycling 6 2 Technical data 7 2 1 Unit data 7 2 2 Un...

Page 4: ...tal or cause serious injury WARNING This combination of symbol and signal word warns of a potentially hazardous situation which if not avoided may be fatal or cause serious injury CAUTION This combina...

Page 5: ...used in line with intended use in accordance with section 1 9 of the operating instructions Under no circumstances should the threshold values specified in the data sheet be exceeded Modifications or...

Page 6: ...ollection points Disposal of equipment and components Only recyclable materials are used in the manufac ture of the devices and components Help protect the environment by ensuring that the devices or...

Page 7: ...rgy efficiency ratio B B B Max installation length for flange heater mm 200 450 450 Height mm 1340 Tilt height mm 1455 1595 2023 Diameter mm 550 760 750 Weight kg 90 173 222 1 te 10 Tv 55 C Tm 45 C Q...

Page 8: ...temperature C 60 60 60 60 Hot water temperature C 50 50 50 50 Cold water temperature C 10 10 10 10 Heating cycle flow rate l h 600 1200 1800 2400 Throughput kW Throughputs EWS 200E Preparation for do...

Page 9: ...nlet temperature C 60 60 60 60 Hot water temperature C 50 50 50 50 Cold water temperature C 10 10 10 10 Heating cycle flow rate l h 600 1200 1800 2400 Throughput kW 18 7 28 1 33 7 37 0 Throughputs EWS...

Page 10: ...E Preparation for domestic water Inlet temperature C 60 60 60 60 Hot water temperature C 50 50 50 50 Cold water temperature C 10 10 10 10 Heating cycle flow rate l h 600 1200 1800 2400 Throughput kW 2...

Page 11: ...in mm 1 Magnesium anode 2 Venting 3 PU insulation 4 Probe sleeve 5 Sealing plug 6 Thermometer 7 Tilt height 8 Cleaning opening 9 Insertion dimension A Hot water B Inlet C Circulation D Return flow E C...

Page 12: ...ot water B Inlet C Circulation D Return flow E Cold water Cold water hot water and circulation pipe are displayed rotated by 90 Hot water at the top circulation in the middle cold water at the bottom...

Page 13: ...1 1 2 stopper fleece insulation cover cap 9 Membrane seal painted blank flange fleece insulation flange cover for DN110 10 1 1 4 stopper 11 Tilt height without storage tank cover 12 Name plate anode i...

Page 14: ...UR insulation CFC HCFC and HFC free The storage tank is encased in a foil casing A blank flange cover is installed to retrofit a fine tube heat exchanger or a flange heating cartridge legionella prote...

Page 15: ...contents of the packaging for com pleteness and check the unit for visible trans port damage Immediately notify your contract partner of any deficiencies n The storage tank may not be transported wit...

Page 16: ...table for the requirements in accordance with VDI 2035 Part 1 with regard to total hard ness Total hardness dH subject to the specific system volume Overall output in kW 20 l kW 20 l kW and 50 l kW 5...

Page 17: ...compliance is not covered by the guarantee Below you will find a suitable form for documenting the filling of the system Filling of heating system with completely deionised water Initial filling Year...

Page 18: ...ure To prevent corrosion or precipitates the glycol mix ture must be checked regularly and replaced if necessary If the glycol mixture needs to be thinned out follow the instructions of the glycol man...

Page 19: ...measuring device 6 Shut off valve 7 Safety valve with drainage line and funnel trap 8 Through flow diaphragm expansion vessel rec ommended if pressure fluctuations are antici pated on the domestic co...

Page 20: ...e installation port Depending on the design of your system a flange heating cartridge or a fine tube heat exchanger can be installed on the flange that is present n Install the flange heating cartridg...

Page 21: ...ter tank must be filled with water before being put into service n A mains connection must be installed and appropriately fused according to the circuit dia gram affixed in the terminal box for the un...

Page 22: ...personnel and documented after the certificate has been issued 1 Check all connections even those which were sealed at the factory flange anode sleeve for leak tightness 2 Then check all pipes for any...

Page 23: ...pressure in the water pipe is higher than permitted a pressure relief valve must be used In hard water areas the limescale which forms inside the storage tank must be removed by a spe cialist after o...

Page 24: ...en Partial draining is also possible through the safety valve in the expansion water funnel drip catcher The safety valve is turned to the Test position to do this CAUTION During drainage of the stora...

Page 25: ...chnical development process Spare parts list No Designation EWS 200E EWS 300E EWS 500E EDP no 1 Fine tube heat exchanger 260200 260200 2 Flange heating cartridge 260160 260160 260160 3 Immersion probe...

Page 26: ...7 Ordering spare parts 25 S Safety Dangers of failure to observe the safety notes 4 General 4 Identification of notes 4 Instructions for the operator 5 Note for inspection work 5 Note for installatio...

Page 27: ......

Page 28: ...t as advisers to our customers in air conditioning and heating technology SFlbCustomer Service Our equipment operates precisely and reliably However in the event of a fault REMKO customer service is q...

Reviews: