13 Appendix
13.1 ErP information
13.1.1 Product fiche
Tab.45 Product fiche
Remeha - Quinta Ace
160
Seasonal space heating energy efficiency class
-
Rated heat output
(Prated or Psup)
kW
152
Seasonal space heating energy efficiency
%
-
Annual energy consumption
GJ
-
Sound power level L
WA
indoors
dB
63
See
For specific precautions in relation to assembly, installation and
maintenance: Safety, page 6
13.2 EC declaration of conformity
The unit complies with the standard type described in the EC declaration
of conformity. It has been manufactured and commissioned in accordance
with European directives.
The original declaration of conformity is available from the manufacturer.
13.3 Checklist for commissioning
Tab.46 Checklist
No.
Commissioning tasks
Confirmation
1
Fill the system with water and check the water pressure
2
Fill the siphon with water
3
Vent the central heating system
4
Check water-side connections for tightness
5
Check the gas supply pressure
6
Check the capacity of the gas meter
7
Check the gas tightness of the connections and gas pipes
8
Vent the gas supply pipe
9
Check the electrical connections
10
Check the flue gas outlet/air supply connections
11
Checking the function and operational status of the boiler
12
Check the air-gas ratio
13
Remove the measuring equipment and close the measuring points
14
Correctly fit the front housing of the boiler
15
Set the room thermostat or the control
16
Instruct the user and hand over the necessary documents
17
Complete the guarantee card online
18
Confirm the commissioning
Date
.
.
dd-mm-yy
Company name, signature of engineer
.
.
13 Appendix
7625116 - v.06 - 17102018
77