1.1. Mind the centre of gravity of the device. See the illustrations for
the exact attachment locations.
2. Carefully lift and move the device.
3. Carefully place the device at the desired location.
5.4
Unpacking & initial preparation
5.4.1
Install the foundation
Install a base or frame as a foundation for the device. The base or frame
must meet the following requirements:
The base or the frame must have holes to connect to the bottom of the
device or machine feet, depending on type and situation.
The top of the frame, or the foundation for the machine must be smooth
and even.
The top of the foundation must be level, and higher than the expected
snow height, to keep the bottom of the machine snow free at all times.
The stability of the foundation must be selected according to the local
conditions, as well as according to the maximum capacity load.
For correct installation of the heat pump, it is recommended to get advice
of an expert for the main support construction. The expert can also advise
on avoiding contact noise to adjacent residential areas.
5.4.2
Install the control panel
The control panel is included. It is pre-wired to the device with a cable with
a length of 10 meter. Install the control panel inside the building.
See
For basic parameters, see the control panel manual.
Fig.17
Crane attachment for the 44
AD-3001690-01
Fig.18
Crane attachment for the 88
AD-3001691-01
Fig.19
Crane attachment for the 168
AD-3001692-01