background image

1-877-789-3245  |  [email protected]  |  www.reliance-foundry.com

Embedded Mounting

Martello Bollard Installation

STEP 5: 

Ensure the area is properly formed to create a 

perimeter that will hold wet concrete. Use a dirt tamper** 

to compact the soil below the intended surface.

Set the Bollard

STEP 6: 

Keep the bollard in its protective packaging and 

carefully place near the installation position.

STEP 7:

 Ensure that the bend 

(A)

 along the entire 

circumference of the bollard is flush with the intended 

finished grade.

STEP 8:

 Orient the bollard so that the sloped side faces the 

road. 

Note: Installers may find it beneficial to use wood or 

brick to position the bollard so that the bend 

(A)

 is flush 

with the intended concrete surface.

 

Pour the Concrete

STEP 9:

 Mix the concrete. Check that the proper ratio of 

water and concrete mix is used—the concrete should have 

a similar texture to moldable clay. 

STEP 10:

 Fill the site around the bollard with concrete until 

it is level with the finished grade.

STEP 11:

 Start filling the body of the bollard through the 

holes at the top. Stir and compact the concrete to get rid 

of all air bubbles. Continue to pour concrete, leaving 1/2" 

of the top clear.

STEP 12:

 When finished with pouring the concrete, remove 

the bollard’s protective packaging.

Install the Cap

STEP 13:

 Screw the concrete anchors 

(B)

 into the cap.

STEP 14:

 Fit the cap onto the bollard, ensuring that the 

longer axis of the cap aligns with the long axis of the 

bollard base. 

** Dirt tamping is not required if working on undisturbed soil

A

FROST LINE

1/2"

LANDSCAPING

MATERIAL

STEP 8

STEP 5

STEP 11

B

STEP 13

STEP 14

R-7651-EM

Reviews: