INSTALLATION INSTRUCTIONS FOR SG SERIES 

  

 

 

 

SG-9, SG-14, SG-18, SG-23, SG-27, SG-36

 

 

 

6.  STEAM PIPING & STEAM NOZZLES 

   

  See “CAUTION 1, 2 & 5" on page 5.  The steam 

nozzle piping should be roughed in 18" above the 
finished floor of the steam room.  Steam nozzles 
must be located away from user pathways where 
the steam will not burn anyone sitting on a bench 
or where they would come in contact with the 
steam.  Care must be taken to AVOID A STEAM 
TRAP. 

 

Use each of the steam nozzles supplied, one per 
steam pipe.  For maximum efficiency, all steam 
pipes must be: 

 a.  secured or suspended. 
 b.  of rigid copper. 
 c.  insulated. 

 

d.  sloped so that no condensate will collect. 

 

e.  installed by the most direct or shortest route  

using the fewest number of elbows, will in 
most cases, maintain a lower pressure, less 
than 1 lb. in the boiling tank, than will a 
longer route with many elbows). 

 

There is to be no restriction in the steam pipes 
between the steam generator and the steam 
nozzles that would in any way cause pressure to 
build in the boiling tank.  See “CAUTION 1, 2 & 3" 
on page 5.  ALL condensate MUST be able to 
drain from ALL sections of the steam pipes at 
ALL times.  Warning steam nozzle is Hot! 

 

There are two copper steam lines with unions 
stubbed out of the top of the steam generator.  
On each of the two steam lines supply and install 
hard copper steam pipes (maximum 25 ft. per 
pipe) to a steam nozzle on each pipe.  Each of 
the two steam pipes is to be terminated with a 
single steam nozzle sized to the steam pipe.  See 
“CAUTIONS 2 & 3" on page 5.  See “Figure 1" 
below for model, steam pipe and steam nozzle 
count and sizes.  For other steam nozzle 
configuration consult with Relax-A-Mist 1-800-
987-8326 or the warranty will be void. 

 

 

 

 

 

Figure 1. 

  

 

model 

steam  pipes          size    

 

 

  no. 

steam  heads 

  inches 

   SG-9 

 

 3/4” 

   SG-14 

 

 3/4” 

 

 

SG-18 

 

     1” 

 

 

SG-23 

 

  1 - 1/4” 

 

 

SG-27 

 

  1 - 1/4” 

 

 

SG-36 

 

  1 - 1/2”  

7.  THERMOSTATS

 

 

The electronic thermostats supplied with the 
Relax-A-Mist are Johnson Controls models 
A350 HI TEMP (operating temperature), S350 
LO TEMP (standby temperature) and D350 
digital readout.  When plugged together, these 
thermostats control 2 room temperatures with 
one sensor.  The readout D-350 displays the 
room temperature or the set point, in real time. 

 
 

During the room construction, there should be a 
3/4 inch conduit (i.e. plastic) installed in the wall 
to facilitate the installation of the room 
temperature sensor.  The conduit should enter 
the room so the sensor will be positioned 5 feet 
from the finished floor or at the shoulder height 
of a person sitting at the highest seating level.   

 
 

The acrylic temperature sensor guard, supplied 
with the generator, must be installed in a 
vertical position to encourage the passage of air 
around the sensor.  This makes it much easier 
to accurately monitor the room temperature.  
Mount the thermostat din rail and controls on a 
wall next to the steam generator where they 
can not be tampered with. 

 

    THERMOSTAT  HOOKUP 

 

The thermostats are to be electrically 
connected to the sensor and to the steam 
generator using #18 AWG LVT wire, or 
equivalent, as follows: 

 
 

Note: Connect the A-350, the S-350 and the 

D-350 controls by plugging them 
together on the din rail provided.  Then 
proceed with the wiring. 

 
    TEMPERATURE  SENSOR  TO  CONTROL

 

 

 

i. Identify the "SEN" and the "COM" 

terminals in the upper left side of the HI 
TEMP model A350 (left) thermostat 
control. 

 
 

 

ii. Connect one wire from the room 

temperature sensor to the “SEN” 
terminal. 

 
   

 iii.  Connect the 2nd wire from the room 

temperature sensor to the “COM” 
terminal. 

 