ELECTRICAL SYSTEM OPERATION
REGENCY ULTRA MOTORHOME
E l e c t r i c a l S y s t e m O p e r a t i o n
|
49
GENERATOR
Auxiliary LP Gas Generator (OPTIONAL)
Generators are installed below the floor.
Before operating the generator, refer to the LP gas
generator operator’s manual located in the
Motorhome Information Bag.
Operating the Auxiliary LP Gas Generator
Turn on the LP gas valve by depressing the top of the
propane shut off switch located in the utility center
in the driver’s side exterior compartment.
The LP Gas Generator control panel is located in the
overhead cabinet above the coach entrance door.
Starting the Auxiliary LP Gas Generator
o
Depress and hold the top of the generator
start button until the generator engine starts
running, then release the button.
o
Allow the generator engine to settle and run
smoothly before operating any electrical
appliances.
o
Become familiar with the output capacity and
capability of your generator.
o
Be careful not to overload the generator.
Stopping the Auxiliary LP Gas Generator
-
Depress and hold the bottom of the generator
stop button until the generator engine has
completely stopped.
Generator Hour Meter
This meter is for tracking usage of the generator
Refer to the generator manual in the Motorhome
Information Bag for further details on operation and
maintenance.
NOTICE
The generator starter draws power from the
coach batteries, so the ignition does not have to
be on for the generator to operate.
NOTICE
There is a breaker on the side of the unit. If the
power plant is running and there is no power
check this breaker if it is tripped.
It is recommended that the generator be run a
minimum of two hours a month.
Be sure to check the generator oil reservoir on a
regular basis.
Summary of Contents for ULTRA
Page 1: ......
Page 2: ...THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 3: ......
Page 4: ...THIS PAGE LEFT BLANK INTENTIONALLY ...