Manual
– TopCon TC.LAE
Installation and commissioning
41 / 56
2016-06-08
6.2.7.3.
Removing/ Mounting of the filling hoses
3
2
1
4
Fig. 25
Removing/ Mounting of the filling hoses.
Preparation:
Make the coolant fill-up set available with:
o
Coolant canister for base ethylene-glycol (EG).
For further information, refer to chapter 6.1.2, page 26.
o
The fill-up hoses.
Make a collection vessel available
Capacity:
1 l.
Make an absorbent cloth or paper available.
Remove the Allen screws,
refer to chapter 6.2.7.2 , page 40.
Procedure: Mounting the hoses for pumping out
Mount the filling hose
-2-
in the left side of the block
-3-
.
The hose with its mounting nipple.
Insert the hose side without the nipple in the collection vessel.
Procedure: Removing of the hoses after the pumping out
Remove the filling hose
-2-
from the left side of the block.
Empty the content of the hose
-2-
into the available vessel.
Dispose the coolant in the vessel into the coolant reserve can.
Fasten the screws in the filling block,
refer to chapter 6.2.7.2, page 40.
Keep the hoses of the coolant fill-up set.
Wipe off the splashed coolant via the available absorbent cloth or
paper.