UM-0206(1)
47 | P a g e
Section(s)
Description
Effect/ Reason
3.11
Update to control of lifting assembly guidance
Safety note added with recommendation to evaluate height clearance needed for lifting plan, and
risk of crane limit switches.
Operations
Safety recommendation
3.12
Addition of lifting assembly clearance height tables.
Supports evaluation of height clearance in lifting plan described in section 3.10.
Operations
Data to support safety recommendation
3.8
Addition of Hook Compatibility with Lifting Assembly (rigging)
Supply/ Operations
Ensure Client procedures correct size part
4.10
Inspection checklist grouped into four assemblies.
Inspection checklist items grouped together to segment procedure into focussed sections.
Inspection and Maintenance
Clearer procedure
4.10
Visual, Examination, and Post Test Inspection checklist combined into one sheet.
Inspection procedures have large overlaps. Combining checklists reduces risk of selecting incorrect
checklist and highlights differences between different inspections.
Inspection and Maintenance
Clearer procedure
4.10
Addition of Torque Values
Previously only contained in Identification Drawings document
Inspection and Maintenance
Clearer procedure
4.11
Addition of Report of Thorough Examination Template.
Report of Thorough Examination is becoming best practice for recording lifting equipment
inspections (LEEA). Ensures minimum data is recorded by inspector.
Inspection and Maintenance
Best practice record of inspection.
4.3
Addition of Care in use/ Preventative maintenance guidance
Addition of preservation guidance for users. (Previously not included in XT6/ XT10 user manuals)
Inspection and Maintenance
Additional guidance
3.7, 6.4
Removal of under seat light luggage box from accessories. This assembly is no
longer provided.
Production/ Supply
Change in production/ supply
For any clarification on these updates and changes please contact Reflex Marine.
Summary of Contents for FROG-XT Series
Page 1: ...USER MANUAL REV 1 UM 206 1 Issue date 13 Oct 2020 Original Instructions...
Page 31: ...UM 0206 1 30 P a g e Figure 12 FROG 10 Pre Operational Visual Check List...
Page 43: ...UM 0206 1 42 P a g e 7 Certificates 7 1 EC Attestation of Conformity Frog XT4...
Page 44: ...UM 0206 1 43 P a g e 7 2 EC Attestation of Conformity Frog XT6...
Page 45: ...UM 0206 1 44 P a g e 7 3 EC Attestation of Conformity Frog XT10...
Page 49: ...UM 0206 1 48 P a g e...