UM-0206(1)
33 | P a g e
Frog XT Inspection checklist form (Page 2/3)
Unit Serial Number
Inspection date
Inspected by
No. Part/ Assembly
V
E
P Action
Comment on
Action / Condition
Information/
Measurement
2
Seat & Harness Assembly
2.1
Seat Support Assembly
✓
✓
✓
Check signs of damage. Ensure all fittings are secure.
-
2.2
Seats
✓
✓
✓
Check signs of damage. Ensure all fittings are secure.
-
2.3
Seat Harnesses
✓
✓
-
Inspect Harnesses for signs of wear, fraying, or damage. Check
attachment points are secure.
-
✓
✓
-
Sit in each seat and check fastening of each harness operates correctly.
2.4
Stretcher Fittings
✓
✓
-
Visually inspect the stretcher fittings to ensure that they are all present,
in good condition, and operational.
-
3
Damping System and Landing Feet
3.1
Springs
Periodic Replacement*
✓
✓
-
Check condition and operation of springs. If springs show excessive
corrosion or have started to compress, then they should be replaced.
Springs can be susceptible to yield over time. This can be verified by
measuring the deflection of the seat base. The top of the sliding sleeve
should rest against the horizontal compression bar. If the gap is
greater than 10mm, then the springs should be replaced.
Gap Height:
✓
✓
-
Check the spring cap plate for any signs of deformation.
3.2
Dampers
Periodic Replacement*
✓
✓
-
-
Ensure that threads of damper rod-end are not visible below the clevis
eye. Ensure that there is no sign of fluid leaking onto the damper rods.
Check mounting points have no deformation.
-
✓
-
Disconnect dampers and check for bowing of the damper rods.
3.3
Landing Feet
✓
✓
✓
Examine Landing feet to ensure good condition and properly secured.
Do not go underneath an active lift.
Heights:
✓
✓
-
When unit is on floor. Measure height of each foot.
Replace if under 100 mm in height
✓
✓
-
Small cuts and damage are acceptable. The foot should be replaced
when damage larger than 50mm is present.
Summary of Contents for FROG-XT Series
Page 1: ...USER MANUAL REV 1 UM 206 1 Issue date 13 Oct 2020 Original Instructions...
Page 31: ...UM 0206 1 30 P a g e Figure 12 FROG 10 Pre Operational Visual Check List...
Page 43: ...UM 0206 1 42 P a g e 7 Certificates 7 1 EC Attestation of Conformity Frog XT4...
Page 44: ...UM 0206 1 43 P a g e 7 2 EC Attestation of Conformity Frog XT6...
Page 45: ...UM 0206 1 44 P a g e 7 3 EC Attestation of Conformity Frog XT10...
Page 49: ...UM 0206 1 48 P a g e...