5.4
Crane Operator Guidance
When landing the FROG-6 on the deck of a heaving vessel the Crane Operator must always release
and maintain line slack to prevent any snatching. This means the FROG-6 will be secure on the deck
and will provide occupants plenty of time to enter and exit the FROG-6. (This landing procedure is
different to the rope basket procedure, which requires the Crane Operator to maintain tension on
the hoist to keep the soft rope basket upright during entry and exit).
Fig 1: Sling Diagram
For the standard 30 ft / 9 m sling provided with the FROG-6, it is generally recommended that
approximately 10 ft / 3 m of slack is paid out once the unit has landed on the vessel. However, the
required amount may vary according to sea state and vessel motion response. The Crane Operator
must pay out sufficient slack to avoid snatching, although, must avoid paying out more than is
necessary as the section of sling hanging could constitute a hazard to crews alighting or entering the
capsule.
It is also recommended that the Crane Operator
slews the boom ‘down weather’ from the capsule.
This will provide more time for the Crane Operator / crews to react in the event of a failure of the
vessel’s station keeping.
5.4.1
Use of Shorter Slings
Reflex Marine Ltd recommends the use of a 30 ft / 9 m sling, however for operations where the 30 ft
sling is not suitable then a 20 ft / 6 m or 10 ft / 3 m sling can be supplied.
It must be noted that using shorter slings increases the risk of snatching. Using the 20 ft / 6 m sling,
10 ft / 3 m of slack will provide a 17.3 ft / 5.3 m allowable offset before the sling becomes taught
from the crane hook weight
–
this does not however account for vessel heave. For a 10 ft / 3 m sling,
8 ft / 2.4 m of slack will provide 9.8 ft / 2.7 m (allowable offset).
Using a shorter sling set also increases risks associated with the hook block being in close proximity
to the passengers alighting.
Note: The operating parameters in Section 3.2 are defined for a FROG-6 with a sling length of 30 ft / 9 m. For transfers
using a shorter sling an additional risk assessment combined with dry runs should be performed to establish safe
operation routines and weather conditions.
Summary of Contents for FROG-6 HC6-01 620
Page 62: ...User Manual FROG 6 UM 0007 REV 06 Page 62...
Page 63: ...User Manual FROG 6 UM 0007 REV 06 Page 63...
Page 64: ...User Manual FROG 6 UM 0007 REV 06 Page 64...
Page 65: ...User Manual FROG 6 UM 0007 REV 06 Page 65...
Page 66: ...User Manual FROG 6 UM 0007 REV 06 Page 66...
Page 67: ...User Manual FROG 6 UM 0007 REV 06 Page 67...
Page 68: ...User Manual FROG 6 UM 0007 REV 06 Page 68...
Page 69: ...User Manual FROG 6 UM 0007 REV 06 Page 69...
Page 70: ...User Manual FROG 6 UM 0007 REV 06 Page 70...
Page 71: ...User Manual FROG 6 UM 0007 REV 06 Page 71...
Page 72: ...User Manual FROG 6 UM 0007 REV 06 Page 72...
Page 73: ...User Manual FROG 6 UM 0007 REV 06 Page 73...
Page 74: ...User Manual FROG 6 UM 0007 REV 06 Page 74...
Page 75: ...User Manual FROG 6 UM 0007 REV 06 Page 75...
Page 76: ...User Manual FROG 6 UM 0007 REV 06 Page 76...
Page 77: ...User Manual FROG 6 UM 0007 REV 06 Page 77...
Page 78: ...User Manual FROG 6 UM 0007 REV 06 Page 78...
Page 81: ...User Manual FROG 6 UM 0007 REV 06 Page 81 12 2 Decals Vinyl Stickers Located on Buoyancy Units...
Page 82: ...User Manual FROG 6 UM 0007 REV 06 Page 82...
Page 83: ...User Manual FROG 6 UM 0007 REV 06 Page 83...
Page 84: ...User Manual FROG 6 UM 0007 REV 06 Page 84 12 3 Decal Operating Instructions Located on Seat...
Page 88: ...User Manual FROG 6 UM 0007 REV 06 Page 88 Link to Index Link to Index...
Page 93: ...User Manual FROG 6 UM 0007 REV 06 Page 93...
Page 94: ...User Manual FROG 6 UM 0007 REV 06 Page 94...
Page 95: ...User Manual FROG 6 UM 0007 REV 06 Page 95...