User Manual
FROG-6
UM-0007-REV.06
Page 19
4.4
Operational Planning
An overall plan must be in place for the proposed personnel transfer operation which details all of
the relevant information:
i.
Installation name.
ii.
Vessel name.
iii.
Number of personnel to be transferred - vessel to installation.
iv.
Number of personnel to be transferred - installation to vessel.
v.
Key personnel on installation.
vi.
Key personnel on vessel.
vii.
Installation crane to be used.
viii.
Crane hoist speed.
ix.
Requirements for visual inspections of equipment.
x.
Vessel position and station keeping limits.
xi.
Environmental limits.
xii.
Current and forecast weather conditions.
xiii.
Checklists to be used.
4.5
Briefings
Ensure that passengers and crews (both installation and vessel) are fully briefed prior to an
operation. It is recommended that video briefings are utilised for briefing transfer passengers
supplemented as necessary by verbal briefing on any relevant installation / vessel specific
information.
4.6
Supervision
All transfer operations must be properly supervised. All personnel directly involved in the transfer
operation should be appropriately qualified and experienced.
4.7
Transfer Log
Operational records must be maintained by both the installation and the vessel. Records must
include:
i.
Time of vessel in position.
ii.
Time of checklists completed.
iii.
Time of commencement of transfer operations.
iv.
Weather conditions.
v.
Vessel motion (roll, pitch and heave).
vi.
Any special conditions or circumstances.
vii.
Number of passengers transferred to installation.
viii.
Number of passengers transferred to vessel.
ix.
Time of completion of transfer operation / vessel clear of installation.
x.
Name of the Lift Supervisor.
An example transfer log is included in
of this document.
Summary of Contents for FROG-6 HC6-01 620
Page 62: ...User Manual FROG 6 UM 0007 REV 06 Page 62...
Page 63: ...User Manual FROG 6 UM 0007 REV 06 Page 63...
Page 64: ...User Manual FROG 6 UM 0007 REV 06 Page 64...
Page 65: ...User Manual FROG 6 UM 0007 REV 06 Page 65...
Page 66: ...User Manual FROG 6 UM 0007 REV 06 Page 66...
Page 67: ...User Manual FROG 6 UM 0007 REV 06 Page 67...
Page 68: ...User Manual FROG 6 UM 0007 REV 06 Page 68...
Page 69: ...User Manual FROG 6 UM 0007 REV 06 Page 69...
Page 70: ...User Manual FROG 6 UM 0007 REV 06 Page 70...
Page 71: ...User Manual FROG 6 UM 0007 REV 06 Page 71...
Page 72: ...User Manual FROG 6 UM 0007 REV 06 Page 72...
Page 73: ...User Manual FROG 6 UM 0007 REV 06 Page 73...
Page 74: ...User Manual FROG 6 UM 0007 REV 06 Page 74...
Page 75: ...User Manual FROG 6 UM 0007 REV 06 Page 75...
Page 76: ...User Manual FROG 6 UM 0007 REV 06 Page 76...
Page 77: ...User Manual FROG 6 UM 0007 REV 06 Page 77...
Page 78: ...User Manual FROG 6 UM 0007 REV 06 Page 78...
Page 81: ...User Manual FROG 6 UM 0007 REV 06 Page 81 12 2 Decals Vinyl Stickers Located on Buoyancy Units...
Page 82: ...User Manual FROG 6 UM 0007 REV 06 Page 82...
Page 83: ...User Manual FROG 6 UM 0007 REV 06 Page 83...
Page 84: ...User Manual FROG 6 UM 0007 REV 06 Page 84 12 3 Decal Operating Instructions Located on Seat...
Page 88: ...User Manual FROG 6 UM 0007 REV 06 Page 88 Link to Index Link to Index...
Page 93: ...User Manual FROG 6 UM 0007 REV 06 Page 93...
Page 94: ...User Manual FROG 6 UM 0007 REV 06 Page 94...
Page 95: ...User Manual FROG 6 UM 0007 REV 06 Page 95...