background image

fdafdfsdaf

Quick Guide to REFMATE

Getting started - Start up and 

refrigerant choice

REFCO Manufacturing Ltd. 
Industriestrasse 11  

Tel.: +41 41 919 72 82 

[email protected] 

Certified:

6285 Hitzkirch - Switzerland 

Fax: +41 41 919 72 83 

www.refco.ch 

ISO 9001 / 14001 

 

 

2

 

 

4

 

 

3

 

 

5

 

 

1

 

 

1

 

 

2

 

 

3

 

 

4

 

 

5

Switch on        and wait until device has started up
Reset pressure to 0 bar(g) by pressing at least 3 s 
Choose refrigerant               and confirm 
Close valves and attach hoses

Change from analog to digital screen

Reviews: