OPERATION and MAINTENANCE
Rev *
32 of 54
(909)287-2100
JOBSITE SET-UP
Refer to the Safety Manual for set-up safety precautions not limited to the following
guidelines:
Ensure Machine Can Be Safely Operated in Set-Up Location
Away from Hazards and Dangers
Away from Slopes and Excavations
Position Machine on As Solid and Level Ground As Possible
Adjust height of Machine and remove Leg pins
Secure Machine Positions with Leg Pins and Locks
PRIMING
Priming consists of pumping a lubricant to coat the s-tube and delivery lines
to assist the initial concrete material in getting through the delivery lines and
avoid blockages. Once the delivery lines are full of concrete, that material
will supply the lubrication necessary for the material to flow through the
delivery lines. However, it is imperative that a primer be used ahead of the
initial concrete material to pre-lubricate the lines in order to avoid blockages.
A suggested grout to use for priming and lubrication may consist of 2 parts
sand and 1-part cement and mixed to a consistency of a thick cream.
The amount of grout required depends on the length of the delivery line as
well as the material being pumped. Operator experience will eventually
indicate the amount to be required.
In addition to grout, there is a wide variety of priming products available on
the market.
Summary of Contents for B20HP
Page 11: ...OPERATION and MAINTENANCE Rev 10 of 54 www reedpumps com 909 287 2100...
Page 12: ...OPERATION and MAINTENANCE Rev 11 of 54 www reedpumps com 909 287 2100...
Page 14: ...OPERATION and MAINTENANCE Rev 13 of 54 www reedpumps com 909 287 2100...
Page 17: ...OPERATION and MAINTENANCE Rev 16 of 54 www reedpumps com 909 287 2100...
Page 18: ...OPERATION and MAINTENANCE Rev 17 of 54 www reedpumps com 909 287 2100...
Page 25: ...OPERATION and MAINTENANCE Rev 24 of 54 www reedpumps com 909 287 2100...
Page 26: ...OPERATION and MAINTENANCE Rev 25 of 54 www reedpumps com 909 287 2100...
Page 27: ...OPERATION and MAINTENANCE Rev 26 of 54 www reedpumps com 909 287 2100...
Page 28: ...OPERATION and MAINTENANCE Rev 27 of 54 www reedpumps com 909 287 2100...
Page 29: ...OPERATION and MAINTENANCE Rev 28 of 54 www reedpumps com 909 287 2100...
Page 30: ...OPERATION and MAINTENANCE Rev 29 of 54 www reedpumps com 909 287 2100...
Page 31: ...OPERATION and MAINTENANCE Rev 30 of 54 www reedpumps com 909 287 2100...
Page 55: ...OPERATION and MAINTENANCE Rev 54 of 54 www reedpumps com 909 287 2100 NOTES...
Page 56: ...89334 T4 C SERIES CONTROL PANEL 89113 PCL WIRING HARNESS SCHEMATIC...
Page 95: ...X 8 26 2020 REV Q...
Page 97: ...HYDRAULIC ELECTRICAL SCHEMATICS...
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ...TRAILER HARNESS...
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ......
Page 231: ......
Page 232: ......
Page 233: ......
Page 234: ......
Page 235: ......
Page 236: ......
Page 237: ......
Page 238: ......
Page 239: ......
Page 240: ......
Page 241: ......
Page 242: ......
Page 243: ......
Page 244: ......
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......
Page 260: ......
Page 261: ......