Wiring | 17
Wiring the PowerDock Terminal Assembly
1.
If using your own cables, terminate one end of each cable with the appropriate sized/rated lug.
See
'Sourcing Lugs/Ring Terminals' (page 15)
for more information.
2.
Remove the 4 × Nyloc nuts from the screw threads on the Terminals.
3.
Route the cables through the cable entry holes at the bottom of the Terminals housing. Slide the
lugs over the threaded studs in the order shown in the Wiring View.
IGN
Solar
ALT
GND
4
3
2
1
4.
Replace the 4 × Nyloc nuts and tighten to 4 ± 0.5 Nm (2.95 ± 0.37 lbf-ft) — use a 4 mm (5/32")
Allen key on the reverse side of the terminals to hold the bolt still as it is tightened.