
Installation
Tubing Kit Installation
20
Figure 17. Installed Tubing From Kit In Compression Bushing
Figure 18. Recommended Power Wire Entry Through The Compression Bushing
After wiring is in place, screw
down top plate of assembly
to compress bushing and seal
entry.
Tubing from kit in center
hole of compression bushing
Customer supplied
seal off and 3/4-14 NPT
nipple
vsfc\vsfcbushing2.eps
Tubing must be long enough
so that its end will be submerged
in sealing compound.
WARNING
Route the drain wire
from power cable
through tubing
Route 4 wires from power (P) cable
(red, blue, orange, and black)
each in an outer hole of bushing
3/8" tubing from kit
in center hole of
bushing
P
P
P
P
P
vsfc\vsfcbushing3.eps