Introduction

Safety Precautions

2

Safety Precautions

The following safety symbols are used throughout this manual to alert you to important safety hazards and 
precautions.

• The equipotential bonding must be carried out by the installer in accordance with the nationally applicable 

installation regulations. For this purpose the piping components of the installed pump must be used.

• Protection against lightning reduces the risk of loss, damage or injury from direct strikes and against low energy 

surges.

• Protection provided by the various methods and approaches as prescribed by NFPA 780 and the IEC 62305 

series of standards. Protection to the electronic equipment, communication and signal lines is ensured by 
providing surge protection to them.

• FIRE HAZARD! Do NOT use power tools during the installation or maintenance of equipment. Sparking could 

ignite fuel or vapors, resulting in fire. Use only spark-proof tools.

Note: This information is generated as a consequence of carrying out the ignition hazard assessment.

EXPLOSIVE

Fuels and their vapors are extremely explo-
sive if ignited.

FLAMMABLE

Fuels and their vapors are extremely flamma-
ble.

WARNING

Warning Alert - read message and follow 
instructions to avoid serious injury, death, or 
substantial property damage.

TURN POWER OFF

Live power to a device creates a potential 
shock hazard. Turn Off power to the device and 
associated accessories when servicing the 
unit.

ELECTRICITY

High voltage exists in, and is supplied to, the 
device. A potential shock hazard exists.

FENCE OFF WORK AREA

Fuels and their vapors are extremely explosive 
if ignited. Keep hazardous zone free of unau-
thorised personnel and vehicles. Put up fenc-
ing and/or barricades to safeguard work area.

WEAR EYE PROTECTION

Wear eye protection when working with pres-
surized fuel lines or epoxy sealant to avoid pos-
sible eye injury.

GLOVES

Wear gloves to protect hands from irritation or 
injury.

READ ALL RELATED MANUALS

Knowledge of all related procedures before 
you begin work is important. Read and under-
stand all manuals thoroughly. If you do not 
understand a procedure, ask someone who 
does.

WARNING

Portions of this product are to be installed and operated in the highly 
combustible environment of a LPG storage tank. It is essential that 
you carefully read and follow the warnings and instructions in this 
manual, failure to do so, can result in damage to property, 
environment, personal injury or death.

OFF

OFF

Summary of Contents for LPG Premier

Page 1: ...Manual No 051 327 1 Revision N Installation Guide LPG Premier LPG Premier MidFlow LPG Premier HiFlow...

Page 2: ...f any damages and or shortages within 30 days of receipt of the shipment as stated in our Terms and Conditions VEEDER ROOT S PREFERRED CARRIER 1 Fax Bill of Lading to V R Customer Service at 800 234 5...

Page 3: ...ump Motor Unit 19 Fitting the Pump Motor Unit into the Manifold or Storage Tank 21 Electrical Connection 21 Determining Correct Motor Rotation 21 Three Phase Current Unbalance 21 Typical System Scheme...

Page 4: ...e 9 Typical Scheme For A Direct Installation With Vertical Submersible Pump Motor Unit 27 Figure 10 Service Parts 31 Tables Table 1 LPG Pump Motor Unit Models 4 Table 2 Recommended Material List for D...

Page 5: ...n through the conduit pipe The conduit pipe is mounted inside the product line and is sealed against the pumped liquid The electrical wires are mounted in a plug pigtail which provides a seal into the...

Page 6: ...apors are extremely flamma ble WARNING Warning Alert read message and follow instructions to avoid serious injury death or substantial property damage TURN POWER OFF Live power to a device creates a p...

Page 7: ...rlocked and are enclosed in a stainless steel shell There is not a requirement for initial bearing running in period for the Red Jacket submersible LPG pumps For all types of Red Jacket submersible LP...

Page 8: ...ion with the pigtail discharge head consists of a metal body Ex d flameproof enclosure and electrical connections The wires in the connectors are cast in epoxy The rotor conductors are copper bars Tab...

Page 9: ...ge using an L1 plug gauge Apply Loctite 565 570 or 577 thread sealant Butane and Propane resistant to both ends of the conduit pipe Direct Installation Installing the submersible pump directly into th...

Page 10: ...stallation of Red Jacket LPG Pump Motor Unit FLANGED VALVE FLANGE VAPOR LINE LIQUID LINE WITH DIRECTION ARROW 4 5 3 4 VAPOR LINE 1 1 4 DISPENSING LINE 9 FILL 2 15 24 2 1 3 18 11 10 17 20 19 15 14 13 2...

Page 11: ...e 5 if applicable 7 Flange 2 8 Kit conduit box 1 Red Jacket 114 115 5 9 Ball valve 2 Argus EK 71 10 Relief valve 1 4 Rego 3127 G 11 Remote control valve 3 4 Argus EK 71 Pneu Electrto 12 Internal bleed...

Page 12: ...ified as an unfired pressure vessel and is designed according to regulations for Pressure Vessels The manifold must be suitable for the type of pump to guarantee the above described minimum requiremen...

Page 13: ...Jacket LPG Pump Motor Unit FLANGED VALVE FLANGE VAPOR LINE LIQUID LINE WITH DIRECTION ARROW MANIFOLD 12a 31 7 8 3 4 VAPOR LINE 1 1 4 DISPENSING LINE 30 15 18 FILL 2 21 33 5 2 1 4 3 34 6 29 24 17 16 23...

Page 14: ...5 2h Regulations 10 Flange 5 11 Ball valve 1 2 Argus EK 71 12 Equalization line acc 8 5 2c Regulations 12a Excess flow valve 3 4 Rego A3272 G if applicable 13 Flange 2 14 Kit conduit box 1 Red Jacket...

Page 15: ...an itemized list for the Figure 3 manifold Figure 3 Horizontal Manifold With Red Jacket LPG Pump Motor Unit 31 Relief valve 1 4 Rego 3127 G 32 Manhole cover NW 420 525 mm 33 Check valve 2 Rego A3186...

Page 16: ...9 Excess flow valve 3 4 Rego A3272 G 10 Flange 5 11 Ball valve 3 4 Argus EK 71 12 Vapor return acc 8 5 2c Regulations 13 Flange 2 14 Kit conduit box 1 Red Jacket 114 115 5 15 Ball valve 2 Argus EK 71...

Page 17: ...the tank and the pressure of the manifold to overcome running dry of the submersible pump by low liquid level and to equalize the pressure during refill of the installation The design of the equalizat...

Page 18: ...etely submerged in the liquid This so called NPSH Net Positive Suction Head is 127 mm 5 inches above pump inlet opening for all types Red Jacket submersible LPG pumps Cavitation is when the liquid flo...

Page 19: ...and it is to be recommended to include in the installation a so called Low pressure Dry Run protection unit preferably based on pressure technology When installed according to the specifications the...

Page 20: ...he manifold s inlet opening 4 Installing the submersible pump directly into the storage tank without a manifold is allowable only when permitted by local regulations In such installations the clearanc...

Page 21: ...2 456 50 5 4 20 8 4 10 4 3 7 P500V17 24 5 0 3 7 3 342 456 50 8 8 33 4 9 5 9 3 7 Part Number Model Weight kg lbs 410687 001 LPG 21 10 21 410687 002 LPG 24 10 21 410687 003 LPG 17 11 24 410686 001 P300V...

Page 22: ...esence of an authorized technician System Description The Red Jacket submersible LPG pump is fitted into the special developed manifold which has to be installed into one of the manholes of the storag...

Page 23: ...sket 1 Pigtail connector 14 AWG 3 meter 10 feet 1 Socket screws and lock washers 5 16 18 inch 4 of each O ring Viton 53 6 x 2 6 mm 2 11 x 0 103 in 1 This Installation manual 1 rj 051 327 fig2 eps Prem...

Page 24: ...ligning the pump shaft with the motor coupling Secure the pump to the motor by using the cap screws and lock washers supplied with the pump Using a torque wrench the screws should be tightened to 28 3...

Page 25: ...ure with the ball valve closed Next reverse power leads at magnetic starter Repeat pressure test as described above If results are higher than the first test the rotation during the second test is cor...

Page 26: ...as been taken in the preparation of this manual Veeder Root shall not be liable for any misunderstanding errors and or loss or defects arising from the use of this manual Design codes and local regula...

Page 27: ...the data in Table 7 System Components List of appurtenances as shown on the typical schemes of LPG service station underground and aboveground storage tank with submersible pump Table 7 Required Data...

Page 28: ...uired Optional 19 Excess flow valve equalization line 3 4 Optional 20 Insulation joint 2 21 Insulation joint 1 1 4 22 Insulation joint 3 4 23 Filling hose 3 4 24 Filling nozzle 3 4 25 Break away coupl...

Page 29: ...e length as short as possible diameter minimum 8 mm 0 31 in Excess flow valve If design required in equalization line minimum 78 liter min 20 gallon min Premier Hiflow Nomenclature LPG500V17 24 Excess...

Page 30: ...Premier Midflow Nomenclature LPG300V17 17 Excess flow valve Inlet minimum 462 liter min 122 gallon min liquid Ball valve 2 Manifold 6 9 in 175 mm minimum Outlet 1 2 in Vapor return line in Excess flow...

Page 31: ...ported by three support arms a the inlet b discharge head and c at the pump flange i e DSI PA PE 4 38 Pipe Isolator Manifold must be installed 4 5 upwards to avoid vapor lock in manifold Table 10 Mini...

Page 32: ...ttings are tight to prevent leaks 2 Fill the tank and manifold with nitrogen until pressure reaches 100 kPa 14 7 psi Relieve pressure until it reduces to 15 kPa 2 1 psi 3 Repeat the filling with nitro...

Page 33: ...and fill the manifold with nitrogen pressure max 1000 kPa 145 psi until you hear the nitrogen bubbling from the inlet of the manifold 6 Close the inlet ball valve and purge connection secure the inlet...

Page 34: ...he pressure gauge in the liquid line when LPG vapor comes out 8 Open the ball valve of the manifold and secure the ball valve against closing 9 Connect the pressure gauge 10 Connect the power cable in...

Page 35: ...equirements the pump motor unit should be removed from the storage vessel and inspected A Red Jacket submersible Premier Premier Mid Flow or Premier Hi Flow LPG pump is not repairable The pump and mot...

Page 36: ...cle tank is full Contents gauge No problem exists Differential Pressure Low Discharge head or pump is loose creating pressure leak Pump motor assembly Pull pump motor assembly check condition of O rin...

Page 37: ...sure in vehicle tank Vehicle tank temperature Cool tank or reduce number of open nozzles Pump Not Running Contactor coil is not engaged Emergency stop dispenser switch and contactor wiring Close all s...

Page 38: ......

Page 39: ......

Page 40: ...For technical support sales or other assistance please visit www veeder com...

Reviews: