Chapter 4. Red Hat Network Website
57
Figure 4-6. Schedule - Pending Actions
4.7.2. Failed Actions
The
Failed Actions
page displays actions that have failed to succeed. If the action returns an error, it
will be displayed.
4.7.3. Completed Actions
The
Completed Actions
page displays actions that have succeeded.
4.7.4. Archived Actions
The
Archived Actions
page displays actions that you have selected to store for review.
4.7.5. Actions List
In each page, each row in the list represents a single scheduled event or action that might affect
multiple systems and involve various packages. The list contains several columns of information:
•
Select
— Use the checkboxes in this column to select actions. After selecting actions, you can
either add them to your selection list or move them to the
Archived Actions
list. If you archive a
pending action, it is not canceled; The action item just moves from the
Pending Actions
list to the
Archived Actions
list.
•
Action
— Type of action to perform such as Errata Update or Package Install. Clicking an ac-
tion name takes you to its
Action Details
page. Refer to Section 4.7.5.1
Action Details
for more
information.
•
Earliest
— The earliest day and time the action will be performed.
•
Succeeded
— Number of systems on which this action was successful.
•
Failed
— Number of systems on which this action has been tried and failed.
•
In Progress
— Number of systems on which this action is taking place.
•
Total
— Total number of systems on which this action has been scheduled.
Summary of Contents for NETWORK BASIC - USER 4.2
Page 1: ...Red Hat Network Basic User Reference Guide 4 2...
Page 14: ...6 Chapter 1 What is Red Hat Network...
Page 42: ...34 Chapter 2 Red Hat Update Agent...
Page 46: ...38 Chapter 3 Red Hat Network Alert Notification Tool...
Page 70: ...62 Chapter 6 Using Red Hat Network with Red Hat Linux 6 2...
Page 84: ...76 Chapter 7 Red Hat Network Registration Client...
Page 90: ...82 Glossary...
Page 94: ......