background image

TM

JEFFERIES 10X12 FT

OCTAGON SOFT TOP GAZEBO

ASSEMBLY INSTRUCTIONS

ITEM#: A101013211

SKU# 810490385

Need help? We are here for you!  1(866)578 – 6569 24/7 • Toll Free

Summary of Contents for 810490385

Page 1: ...TM JEFFERIES 10X12 FT OCTAGON SOFT TOP GAZEBO ASSEMBLY INSTRUCTIONS ITEM A101013211 SKU 810490385 Need help We are here for you 1 866 578 6569 24 7 Toll Free...

Page 2: ...id in your area Keep all ame and heat sources away from the tent fabric This tent is made with fabric that meets CPAI 84 speci cations for ame resistance It is not re proof The fabric will burn if rig...

Page 3: ...2 B2 P000401085 Right long screen 2 C P000401086 Short screen 6 D1 P000601864 Upper Beam 8 D2 P000601865 Beam 8 D3 P005700791 Adjust tube 8 E1 P000601862 Big roof short tube 2 E2 P000601863 Big roof...

Page 4: ...0Bolt 16 1 CC H050030001 Flat washer M6 60 3 DD H050020017 Spring washer M6 34 2 EE H070010003 Stake 8 180 16 0 FF P005100264 Ring 52 3 GG H010020026 M6 50 Bolt 2 1 HH H040010004 Nut M6 2 1 Z1 H090010...

Page 5: ...HELPFUL HINTS Tools needed and not included Separating parts before starting Provided in hardware pack How many people needed for the installation work 5 19...

Page 6: ...STEP 1 Assembled View Insert the Bottom post A2 A3 to the Top post A1 fixed with Bolt AA and Flat washer CC by Wrench Z1 6 19...

Page 7: ...Assembled View Fixed Short screen C to the Top post A1 with Bolt AA Flat washer CC and Spring washer DD then fixed Panel L2 to the Bottom post A2 A3 with Bolt BB and Flat washer CC tighten by Wrench Z...

Page 8: ...STEP 3 Assembled View Fixed Left long screen B1 to Right long screen B2 with Bolt GG Flat washer CC Spring washer DD and Nut HH tighten by Wrench Z1 8 19...

Page 9: ...STEP 4 Assembled View Fixed assembled Long screen B1 B2 and Short screen C to the Top post A1 with Bolt AA Flat washer CC and Spring washer DD tighten by Wrench Z1 9 19...

Page 10: ...STEP 5 Assembled View Lock the Big roof short tube E1 Big roof long tube E2 and Big roof connection tube F with a snap 10 19...

Page 11: ...STEP 6 Assembled View Lock the Upper Beam D1 and Beam D2 with a snap then lock Beam D2 and Adjust tube D3 with a snap 11 19...

Page 12: ...STEP 7 Assembled View Lock Upper Beam D1 and Big roof connection tube F with a snap then insert the Beam D2 to Top post A1 12 19...

Page 13: ...STEP 8 Assembled View Spread the Big roof canopy N to big roof do not tighten the canopy first 13 19...

Page 14: ...STEP 9 Assembled View Lock Small roof beam G and Small roof connection tube H with a snap 14 19...

Page 15: ...STEP 10 Assembled View Spread Small roof canopy M to the Small roof beam G tighten it 15 19...

Page 16: ...STEP 11 Assembled View Attach the assembled small roof on the big roof Lock Small roof beam G and Big roof connection tube F with a snap then attach the Hook I to Small roof connection tube H 16 19...

Page 17: ...STEP 12 Assembled View Attach the Big roof canopy N s corner without belt to Adjust tube D3 then attach the final canopy corner with belt to Adjust tube D3 tighten them 17 19...

Page 18: ...STEP 13 Hang the mosquito O to netting tube with Ring FF Tie the netting to post with a bandage 1 1 Please do the matching of zippers for different panels as showing the picture Assembled View 18 19...

Page 19: ...STEP 14 Assembled View Fix the Bottom post A2 A3 to the ground by Stake EE 19 19...

Reviews: