SETUP
Power Storage DC 8.0 / 10.0
EN
Page 1: ...SETUP Power Storage DC 8 0 10 0 EN...
Page 2: ...right to make technical changes which serve to improve the device or which increase the safety standard even without separate notification Publisher responsible for the content RCT Power GmbH This in...
Page 3: ...ations of symbols and notes Important instructions in this setup should be followed during installation operation and maintenance of the Power Inverter The following warnings and symbols are used Symb...
Page 4: ...the battery switch to the 0 position To disconnect the mains voltage AC operate the circuit breaker or remove the fuse Do not switch on again until the work is completed Do not switch on again until...
Page 5: ...RCT Power GmbH is not liable for any damage resulting from misuse Any misuse will terminate the manufacturer s warranty guarantee and general liability 3 2 Product description and scope of delivery fi...
Page 6: ...ting Switch on the inverter switch on the fuses section 8 1 p 14 Access the inverter via APP Steps 1 to 7 under Section 8 2 p 15 Configure the power switch if available See manual Power Switch Configu...
Page 7: ...e retardant material Do not install in rooms with explosion hazard Keep away from flammable materials B The inverter must be protected from snow rain direct sunlight dust and salty environments Operat...
Page 8: ...ctrically conductive surfaces of the entire PV system are earthed in the absence of overvoltage protection there might be an increased risk of overvoltage Supported grid forms TT TN C TN S TN C S To p...
Page 9: ...re 4 Step description 1 Remove the cover of the inverter Look for the the AC terminal block Fig 2 A 2 Strip the AC cable accordingly and use the cable gland Fig 1 e Make sure that the connections are...
Page 10: ...inverter 2 Connect the terminal connection X101 with X104 See Fig 2 B 3 Mount the cover if there is no further work to be done If connections are mixed up the unit may be destroyed 4 2 5 DC Battery co...
Page 11: ...2 5 Nm and carry out a pull test to check the connection The colour coding may differ from the illustration depending on the country If required in the country of installation install another protect...
Page 12: ...corresponding cable gland for the supply lines fig 1 d 2 Select the correct interface see next section press the spring contact down to insert the cable figure 14 Pos description 1 X102 Serial RS485...
Page 13: ...detailed information on commissioning Standard communication Additional communication with Power Sensor Additional communication with Power Switch The Power Sensor is already included in the Power Sw...
Page 14: ...n of this connection is done via the menu item Network settings in the RCT Power APP and is explained in the manual figure 17 6 Mounting inverter cover Danger to life or serious injury due to electric...
Page 15: ...ll the Power Switch in the house connection box or nearby 3 Connect the Power Sensor and Power Switch via the patch cable to the corresponding RJ45 interface on the Power Storage see Fig 2 D 4 Further...
Page 16: ...nsors to phases L1 L2 and L3 in the house connection box 3 Connect the power sensor via the patch cable to the inverter at the RJ 45 interface Power Sensor see Fig 4 see Fig 4 4 Further configurations...
Page 17: ...the solar generator voltage by closing the DC load break switch switch position 1 When the input voltage is sufficient the inverter starts operating Please note that the inverter is supplied by PV mod...
Page 18: ...etwork 3 The first time you connect to a unit on an inverter you will need a password The password corresponds to the serial number of your unit see display or type plate 4 Start the RCT Power APP 5 S...
Page 19: ...on 9 Select Login and enter the installer password 0 Click on Country and standard and select the appropriate standard Confirm with Apply 11 The parameters are synchronised and saved Then click on Fin...
Page 20: ...nding field then briefly turns red and then white again A dynamic power reduction can also be realised via the interface X101 ripple control receiver For further information please read the user manua...
Page 21: ...and saves the settings Calibration is started during the next day after installation This involves charging the battery to 100 and then to 0 this can take several hours and also involves balancing th...
Page 22: ...Ensure that other persons stay away from cables and internal components Step description 1 Turn the DC load break switch to 0 See Fig 1 b 2 Switch the battery off via the ON OFF switch on the master...
Page 23: ...of the inverter and its time intervals Position procedure Intervall System cleaning Check whether the heat sink is free of dust If not switch off the unit if it is very dirty allow sufficient time for...
Page 24: ...s manual no liability can be accepted for errors or omissions RCT Power GmbH reserves the right to change the hardware and software features described herein at any time without notice Warranty or lia...
Page 25: ...1 6 A 14 5 A Maximum AC current per phase 15 2 A 15 2 A Nominal frequency 50 Hz 60 Hz Frequency range 45 Hz 65 Hz Max startup current 15 2 A 0 1ms Max failure current RMS 300 mA AC nominal voltage 230...
Page 26: ...85 non condensing Indoor Typical noise emission 35 dB Ambient temperature range 25 C 50 C 40 C at full power or backup power operation Installation Wall mounting Dimensions height x width x depth 570...
Page 27: ...01 2022 RCT Power GmbH Line Eid Str 1 78467 Constance Germany Tel 49 0 7531 996 77 0 Mail info at rct power com Website www rct power com...