Location of Controls
START-UP
PROCEDURES
Before Start-Up
Safe lighting and other performance criteria were met
with the gas manifold and control assembly provided
on the heater when the heater underwent tests speci-
fied in the latest edition of the ANSI-Z21.10.3/CSA 4.3
Standard.
General
Before lighting up a new installation, water should be
flowing through the heater. Water pressure regulator
should be set to minimum 25 PSI.
Initial Start-Up - Pump and
Motor
Many pumps are now direct-drive. They have no cou-
pler or bearing assembly. These pumps do not require
lubrication. Others require SAE-30 non-detergent oil to
lubricate both the motor and the bearing assembly.
Check pump motor for type before adding oil.
Clean dust and lint from pump and motor. Check pump
coupler and tighten if necessary.
Flush system before putting into operation to ensure
that foreign material does not damage pump seals.
CAUTION:
Propane gas is heavier than air and
sinks to the ground. Exercise extreme care in light-
ing heater in confined areas.
CAUTION:
Pump must be off to check oil in bearing
assembly. Do not run pump without water in system.
Summary of Contents for WH-0133
Page 2: ...2 Rev 13 reflects the following Changes to Note on Page 13 Item g on Page 18 ...
Page 15: ...15 Fig 9 Indoor Top Installation ...
Page 24: ...24 0 0133 0181 0401 0514 0824 0926 1826 Piping Diagram Type WH Unitemp 80 System ...
Page 28: ...28 Location of Controls 0400 WH1 WH2 WH3 0181 LOW NOx WH1 ...
Page 29: ...29 Location of Controls 0824 ...
Page 38: ...38 WIRING DIAGRAMS Wiring Diagram WH2 0181 0261 ...
Page 39: ...39 Wiring Diagram WH2 0331 0401 ...
Page 40: ...40 Wiring Diagram WH2 0514 0724 ...
Page 41: ...41 Wiring Diagram WH2 0824 1826 ...
Page 42: ...42 Wiring Diagram WH2 2100 2500 ...
Page 43: ...43 Wiring Diagram WH2 3001 4001 ...
Page 48: ...48 ...
Page 50: ...50 ...
Page 51: ...51 ...