![Raypak TempTracker mod+ Hybrid Installation And Operation Instructions Manual Download Page 55](http://html.mh-extra.com/html/raypak/temptracker-mod-hybrid/temptracker-mod-hybrid_installation-and-operation-instructions-manual_790744055.webp)
TempTracker mod+ Hybrid Installation and Operation Manual
55
HTC# 059105-00D
SYSTEM
A
B
C
D
1 2
RUN
PROGRAM
DO NOT APPLY ANY VOLTAGE
TO INPUT TERMINALS
3 4 5 6 7 8 9 10 11 12
13
15
14
17
16
18
20
19
21
24
23
29
25
27
26
28
32
30 31
L N
-
+
+
T
T
O
O
RS-485
mA
GND
VLT
SYS
A
B
C
D
PWR
CUR / VLT
A
-
+
+
mA
GND
VLT
-
+
+
mA
GND
VLT
+
+
mA
22
-
GND
VLT
+
mA
TEMP
OUTDOOR
O
O
TEMP
SYSTEM
EXTENSION
MODULE
CUR / VLT
B
CUR / VLT
C
CUR / VLT
D
PROVE
/DHW
SHUTDOWN
/SETBACK
FOR ALL CIRCUITS
120VAC, 6A RESISTIVE
OUTPUT RATINGS:
1A PILOT DUTY, 15A TOTAL
115VAC 60Hz , 30VA MAX
INPUT RATINGS:
USE COPPER WIRE,
CLASS 1 WIRE ONLY.
CAUTION
: RISK OF ELECTRIC SHOCK
More than one disconnect switch may be required
to de-energize the equipment before servicing.
ENCLOSED
ENERGY
MANAGEMENT
EQUIPMENT
99RA
/TSTAT
HYBRID
Outdoor Sensor
System Sensor
Prove Jumper Do Not remove
Shield
Shield
L
N
System Pump
L
N
Two 2-Stage
boilers
Activation Signal
Two 2-Stage
boilers
Voltage Signal
Boiler 1
Boiler 2
Boiler 1
Boiler 2
staGInG WIrInG dIaGraM
startup settInGs
Boiler Type = Staging
Boiler Number = 2
Output Type = 2-Stage
two 2-stage Boilers