4.1 Location requirements for SPX
course computers
The installation location must take into account the following
requirements:
• Install below decks in a dry area.
• Mount on a vertical surface, the sides and top must be level.
• Location must be at least 1 m (3 ft.) away from any magnetic
compass.
• Safe from physical damage and excessive vibration.
• Away from any source of heat.
• Away from any potential flammable hazard, such as fuel vapors.
Dimensions
D11947-1
64.5 mm
(2.5 in)
285 mm (11.2 in)
261 mm (10.3 in)
21
1.
5
m
m
(
8.
3
in
)
4.2 Installing the SPX course computer
Use this procedure to install the SPX course computer as a part of
your inboard autopilot system.
Important:
The installation must only be performed with the boat
either on hard standing, or tied up alongside a pontoon or berth.
1. Mount the course computer in an appropriate location and
secure with the screws supplied.
D10448-2
You should also mount the fluxgate compass, autopilot controller
and rudder reference unit (if appropriate) at this time.
2. Route the power, data, compass and any other cables required
for connection to the course computer.
3. Make all necessary connections into the course computer
connector panel.
38
SPX SmartPilot installation instructions
Summary of Contents for SmartPilot SPX-10
Page 1: ......
Page 2: ......
Page 4: ......
Page 6: ...6 SPX SmartPilot installation instructions ...
Page 10: ...10 SPX SmartPilot installation instructions ...
Page 40: ...40 SPX SmartPilot installation instructions ...
Page 44: ...44 SPX SmartPilot installation instructions ...
Page 49: ......
Page 50: ...www raymarine com ...